Global Power Plant Directory121,919 plants · 219 countries & territories

All plants / United Kingdom / England

Teesside Waste power station

WasteOperating

England · United Kingdom

Operating capacity
29 MW
Units
2
Online since
1998
Age
28 yrs

Teesside Waste power station is a 29 MW waste-to-energy plant in England, United Kingdom.

It has 2 units, which came online between 1998 and 2009. It is owned mainly by SUEZ Recycling and Recovery UK. Traced to the top of the ownership chain, its largest owner is Suez Advanced Solutions Holdings Uk (100%). By capacity it is the 24th largest of 332 operating waste-to-energy plants in the United Kingdom.

Owner
SUEZ Recycling and Recovery UK

SUEZ Recycling and Recovery UK [100%]

Parent company
Suez Advanced Solutions Holdings Uk Ltd [100.0%]
Operator
SUEZ Recycling and Recovery UK
Coordinates
54.5955, -1.2591 (exact)
GEM plant ID
L100001046441

Plant details

How this waste-to-energy plant is built and run.

Fuel
Refuse (municipal and industrial wastes)

Timeline

When each unit started, retired, or is planned to retire.

  • Operating
  • Retired
  • In development
  • Until planned retirement

Who owns it

Direct owners, and the owners at the top of each chain, as a share of operating capacity.

Direct owners

Ownership chain

  1. Suez Advanced Solutions Holdings Uk Companyowns 100% of Suez Recycling And Recovery Uk Group Holdings
  2. Suez Recycling And Recovery Uk Group Holdings Companyowns 100% of Suez Recycling And Recovery Holdings Uk
  3. Suez Recycling And Recovery Holdings Uk Companyowns 100% of SUEZ Recycling and Recovery UK
  4. SUEZ Recycling and Recovery UK Companyowns 100% of this plant

Ultimately owned by

No share traced to a government or state body.

Source: Global Energy Monitor, Global Energy Ownership Tracker, September 2026 (CC BY 4.0). Capacity is weighted by each owner’s share.

Units

2 units at this site.

UnitCapacityStatusStartRetired / plannedTechnology
1.0 19 MW Operating 1998——
2.0 10 MW Operating 2009——

Electricity output

How much power this plant produces.

WRI Global Power Plant Database, 2013–2019.

ReportedEstimated
Latest annual output
20 GWh

Estimated · 2017

Capacity factor
8%

Output as a share of running at full power all year

Estimation method
CAPACITY-FACTOR-V1
Show data table
YearReported (GWh)Estimated (GWh)Capacity factorMethod
2013 — — — NO-ESTIMATION
2014 — — — NO-ESTIMATION
2015 — — — NO-ESTIMATION
2016 — — — NO-ESTIMATION
2017 — 20.33 8% CAPACITY-FACTOR-V1
2018 — — — —
2019 — — — —

How it compares

Size among operating waste-to-energy plants.

In the United Kingdom
24th

of 332 waste-to-energy plants · see all

In the world
444th

of 1,963 · largest waste-to-energy plants

Age
28 yrs

Country average for waste-to-energy: 12 yrs

This plantTeesside Waste power station
29 MW
Average waste-to-energy plantIn the United Kingdom, across 332 plants
7.4 MW
Largest in the United KingdomRuncorn Energy from Waste power station
80 MW

4.0× the average waste-to-energy plant in the United Kingdom. About 37% of the size of the largest.

FAQ

About Teesside Waste power station.

Who owns Teesside Waste power station?

Its main owner is SUEZ Recycling and Recovery UK. Traced to the top of each ownership chain, its owners are Suez Advanced Solutions Holdings Uk (100%).

How big is Teesside Waste power station?

It has 29 MW of operating capacity across 2 units. That makes it the 24th largest waste-to-energy plant in the United Kingdom and the 444th largest in the world.

Where is Teesside Waste power station?

In England, United Kingdom, at 54.5955, -1.2591.

When was Teesside Waste power station built?

Its first unit started in 1998 and its newest in 2009.

How much electricity does Teesside Waste power station generate?

An estimated 20 GWh was generated in 2017, a capacity factor of 8%, according to the WRI Global Power Plant Database.

Sources and identifiers

Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.