- Operating capacity
- 29 MW
- Units
- 2
- Online since
- 1998
- Age
- 28 yrs
Teesside Waste power station is a 29 MW waste-to-energy plant in England, United Kingdom.
It has 2 units, which came online between 1998 and 2009. It is owned mainly by SUEZ Recycling and Recovery UK. Traced to the top of the ownership chain, its largest owner is Suez Advanced Solutions Holdings Uk (100%). By capacity it is the 24th largest of 332 operating waste-to-energy plants in the United Kingdom.
- Owner
- SUEZ Recycling and Recovery UK
SUEZ Recycling and Recovery UK [100%]
- Parent company
- Suez Advanced Solutions Holdings Uk Ltd [100.0%]
- Operator
- SUEZ Recycling and Recovery UK
- Coordinates
- 54.5955, -1.2591 (exact)
- GEM plant ID
- L100001046441
Plant details
How this waste-to-energy plant is built and run.
- Fuel
- Refuse (municipal and industrial wastes)
Timeline
When each unit started, retired, or is planned to retire.
- Operating
- Retired
- In development
- Until planned retirement
Who owns it
Direct owners, and the owners at the top of each chain, as a share of operating capacity.
Direct owners
- SUEZ Recycling and Recovery UK Company100%
Ownership chain
- Suez Advanced Solutions Holdings Uk Companyowns 100% of Suez Recycling And Recovery Uk Group Holdings
- Suez Recycling And Recovery Uk Group Holdings Companyowns 100% of Suez Recycling And Recovery Holdings Uk
- Suez Recycling And Recovery Holdings Uk Companyowns 100% of SUEZ Recycling and Recovery UK
- SUEZ Recycling and Recovery UK Companyowns 100% of this plant
Ultimately owned by
- Suez Advanced Solutions Holdings Uk Company100%
No share traced to a government or state body.
See every plant owned by
Source: Global Energy Monitor, Global Energy Ownership Tracker, September 2026 (CC BY 4.0). Capacity is weighted by each owner’s share.
Units
2 units at this site.
| Unit | Capacity | Status | Start | Retired / planned | Technology |
|---|---|---|---|---|---|
| 1.0 | 19 MW | Operating | 1998 | — | — |
| 2.0 | 10 MW | Operating | 2009 | — | — |
Electricity output
How much power this plant produces.
WRI Global Power Plant Database, 2013–2019.
- Latest annual output
- 20 GWh
- Capacity factor
- 8%
- Estimation method
- CAPACITY-FACTOR-V1
Estimated · 2017
Output as a share of running at full power all year
Show data table
| Year | Reported (GWh) | Estimated (GWh) | Capacity factor | Method |
|---|---|---|---|---|
| 2013 | — | — | — | NO-ESTIMATION |
| 2014 | — | — | — | NO-ESTIMATION |
| 2015 | — | — | — | NO-ESTIMATION |
| 2016 | — | — | — | NO-ESTIMATION |
| 2017 | — | 20.33 | 8% | CAPACITY-FACTOR-V1 |
| 2018 | — | — | — | — |
| 2019 | — | — | — | — |
How it compares
Size among operating waste-to-energy plants.
- Age
- 28 yrs
Country average for waste-to-energy: 12 yrs
4.0× the average waste-to-energy plant in the United Kingdom. About 37% of the size of the largest.
FAQ
About Teesside Waste power station.
Who owns Teesside Waste power station?
Its main owner is SUEZ Recycling and Recovery UK. Traced to the top of each ownership chain, its owners are Suez Advanced Solutions Holdings Uk (100%).
How big is Teesside Waste power station?
It has 29 MW of operating capacity across 2 units. That makes it the 24th largest waste-to-energy plant in the United Kingdom and the 444th largest in the world.
Where is Teesside Waste power station?
In England, United Kingdom, at 54.5955, -1.2591.
When was Teesside Waste power station built?
Its first unit started in 1998 and its newest in 2009.
How much electricity does Teesside Waste power station generate?
An estimated 20 GWh was generated in 2017, a capacity factor of 8%, according to the WRI Global Power Plant Database.
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Bioenergy Power Tracker (2026-10) · GEM Wiki page
- OwnershipGlobal Energy Monitor, Global Energy Ownership Tracker, September 2026
- Output 2013–2019WRI Global Power Plant Database v1.3.0 · GBR0000925
- GEM plant IDL100001046441
- REPD plant ID4925
- REPD plant ID4926
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.