- Operating capacity
- 8.3 MW
- Units
- 1
- Online since
- —
- Output a year
- 15 GWh
Sortosville-en-Beaumont is an 8.3 MW wind power plant in France.
By capacity it is the 1,432nd largest of 1,588 operating wind plants in France.
- Owner
- —
- Commissioned
- —
- Coordinates
- 49.4248, -1.7098 (location from Open Power System Data)
- GPPD ID
- WRI1024675
- Data source
- Open Power System Data · via WRI Global Power Plant Database (2021). Not found in current Global Energy Monitor trackers.
Electricity output
How much power this plant produces.
WRI Global Power Plant Database, 2013–2019.
- Latest annual output
- 15 GWh
- Capacity factor
- 21%
- Estimation method
- CAPACITY-FACTOR-V1
Estimated · 2017
Output as a share of running at full power all year
Show data table
| Year | Reported (GWh) | Estimated (GWh) | Capacity factor | Method |
|---|---|---|---|---|
| 2013 | — | — | — | NO-ESTIMATION |
| 2014 | — | — | — | NO-ESTIMATION |
| 2015 | — | — | — | NO-ESTIMATION |
| 2016 | — | — | — | NO-ESTIMATION |
| 2017 | — | 15.08 | 21% | CAPACITY-FACTOR-V1 |
| 2018 | — | — | — | — |
| 2019 | — | — | — | — |
How it compares
Size among operating wind plants.
45% of the average wind plant in France. About 2% of the size of the largest.
FAQ
About Sortosville-en-Beaumont.
How big is Sortosville-en-Beaumont?
It has 8.3 MW of operating capacity. That makes it the 1,432nd largest wind plant in France and the 15,936th largest in the world.
Where is Sortosville-en-Beaumont?
In France, at 49.4248, -1.7098.
How much electricity does Sortosville-en-Beaumont generate?
An estimated 15 GWh was generated in 2017, a capacity factor of 21%, according to the WRI Global Power Plant Database.
What kind of power plant is Sortosville-en-Beaumont?
It is a wind power plant.
Is Sortosville-en-Beaumont still operating?
Yes. 8.3 MW is in operation.
Sources and identifiers
- Output 2013–2019WRI Global Power Plant Database v1.3.0 · WRI1024675
- GPPD IDWRI1024675
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.