Global Power Plant Directory121,919 plants · 219 countries & territories

All plants / United Arab Emirates / Abu Dhabi

Shuweihat S3 power plant

مجمع الشويهات للطاقة والمياه

GasOperatingCombined cycle

Jebel Dhanna · Abu Dhabi · United Arab Emirates

Operating capacity
1.6 GW
Units
2
Online since
2014
Age
12 yrs

Shuweihat S3 power plant is a 1.6 GW gas power plant in Jebel Dhanna, Abu Dhabi, United Arab Emirates.

It has 2 units, online since 2014. It uses combined cycle technology burning natural gas. It is owned mainly by Korea Electric Power Corp and operated by Shuweihat Asia Power. Traced to the top of the ownership chain, its largest owner is Government of South Korea (28%). By capacity it is the 16th largest of 34 operating gas plants in the United Arab Emirates.

Owner
Korea Electric Power Corp

Sumitomo Corp [45%]; Korea Electric Power Corp [55%]

Parent company
Korea Electric Power Corp [55.0%]; Sumitomo Corp [45.0%]
Operator
Shuweihat Asia Power
Coordinates
24.1535, 52.5662 (approximate)
GEM plant ID
L100000405594

Plant details

How this gas plant is built and run.

Technology
Combined cycle
Fuel
Fossil gas: natural gas
Fuel classification
Gas
Combined heat and power
Yes

Timeline

When each unit started, retired, or is planned to retire.

  • Operating
  • Retired
  • In development
  • Until planned retirement

Who owns it

Direct owners, and the owners at the top of each chain, as a share of operating capacity.

Direct owners

Ownership chain

  1. small shareholder(s) Unidentified ownersowns 48.9% of Korea Electric Power
  2. Korea Electric Power Companyowns 55% of this plant

Ultimately owned by

At least 28.1% traced to a government or state body.

Source: Global Energy Monitor, Global Energy Ownership Tracker, September 2026 (CC BY 4.0). Capacity is weighted by each owner’s share.

Units

2 units at this site.

UnitCapacityStatusStartRetired / plannedTechnologyTurbine or engine
1 824 MW Operating 20142039 plannedCombined cycle—
2 824 MW Operating 20142039 plannedCombined cycle—

How it compares

Size among operating gas plants.

In the United Arab Emirates
16th

of 34 gas plants · see all

In Asia
130th

of 1,355

In the world
227th

of 5,616 · largest gas plants

Age
12 yrs

Country average for gas: 21 yrs

This plantShuweihat S3 power plant
1.6 GW
Average gas plantIn the United Arab Emirates, across 34 plants
1.4 GW
Largest in the United Arab EmiratesEmirates Aluminum Smelter Complex power station
3.7 GW

1.2× the average gas plant in the United Arab Emirates. About 44% of the size of the largest.

FAQ

About Shuweihat S3 power plant.

Who owns Shuweihat S3 power plant?

Its main owner is Korea Electric Power Corp. Traced to the top of each ownership chain, its owners are Government of South Korea (28%). It is operated by Shuweihat Asia Power.

How big is Shuweihat S3 power plant?

It has 1.6 GW of operating capacity across 2 units. That makes it the 16th largest gas plant in the United Arab Emirates and the 227th largest in the world.

Where is Shuweihat S3 power plant?

In Jebel Dhanna, Abu Dhabi, United Arab Emirates, at 24.1535, 52.5662.

When was Shuweihat S3 power plant built?

It started operating in 2014.

What kind of power plant is Shuweihat S3 power plant?

It is a gas power plant using combined cycle technology, fuelled by natural gas.

Sources and identifiers

Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.