Global Power Plant Directory121,919 plants · 219 countries & territories

All plants / Saudi Arabia / Makkah

Shuaibah Independent Water and Power Project

محطة كهرباء الشعيبة المستقلة

OilRetiredSteam turbine

Shoaiba · Makkah · Saudi Arabia

Capacity
1.2 GW
Units
3
Online since
—
Status
Retired

Shuaibah Independent Water and Power Project is a retired 1.2 GW oil power plant in Shoaiba, Makkah, Saudi Arabia.

It has 3 units, online since 2010. It uses steam turbine technology burning crude oil. It is owned mainly by Shuaibah Water & Electricity Co. Traced to the top of the ownership chain, its largest owner is Government of Saudi Arabia (49%).

Owner
Shuaibah Water & Electricity Co

Shuaibah Water & Electricity Co [70%]; ACWA Power Co [30%]

Parent company
ACWA Power Co [51.0%]; Public Investment Fund (Saudi Arabia) [22.4%]; Malakoff Corporation Bhd [16.8%]; Saudi Electricity Co [5.6%]; Tenaga Nasional Bhd [4.2%]
Retired
1.2 GW (last in 2025)
Coordinates
20.6843, 39.5214 (exact)
GEM plant ID
L100000408246

Plant details

How this oil plant is built and run.

Technology
Steam turbine
Fuel
Fossil liquids: crude oil
Fuel classification
Oil
Captive plant
Supplies chemicals (power)

Timeline

When each unit started, retired, or is planned to retire.

  • Operating
  • Retired
  • In development
  • Until planned retirement

Who owns it

Direct owners, and the owners at the top of each chain.

Direct owners

Ownership chain

  1. Government of Saudi Arabia Governmentowns 100% of Public Investment Fund (Saudi Arabia)
  2. Public Investment Fund (Saudi Arabia) State bodyowns 32% of Shuaibah Water & Electricity
  3. Shuaibah Water & Electricity Companyowns 70% of this plant

Ultimately owned by

At least 54.6% traced to a government or state body.

Source: Global Energy Monitor, Global Energy Ownership Tracker, September 2026 (CC BY 4.0). Capacity is weighted by each owner’s share.

Units

3 units at this site.

UnitCapacityStatusStartRetired / plannedTechnologyTurbine or engine
1 400 MW Retired 20102025Steam turbine—
2 400 MW Retired 20102025Steam turbine—
3 400 MW Retired 20102025Steam turbine—

FAQ

About Shuaibah Independent Water and Power Project.

Who owns Shuaibah Independent Water and Power Project?

Its main owner is Shuaibah Water & Electricity Co. Traced to the top of each ownership chain, its owners are Government of Saudi Arabia (49%), Government of Malaysia (5%) and Yayasan Pelaburan Bumiputra (2%).

How big is Shuaibah Independent Water and Power Project?

It has 1.2 GW of capacity across 3 units.

Is Shuaibah Independent Water and Power Project still operating?

No. It has been retired since 2025.

Where is Shuaibah Independent Water and Power Project?

In Shoaiba, Makkah, Saudi Arabia, at 20.6843, 39.5214.

When was Shuaibah Independent Water and Power Project built?

It started operating in 2010.

Sources and identifiers

Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.