Global Power Plant Directory121,919 plants · 219 countries & territories

All plants / China

Shenzhen Baoan Laohukeng Stage 2

GasOperating

China

Operating capacity
60 MW
Units
1
Online since
—
Output a year
182 GWh

Shenzhen Baoan Laohukeng Stage 2 is a 60 MW gas power plant in China.

By capacity it is the 359th largest of 470 operating gas plants in China.

Owner
—
Commissioned
—
Coordinates
22.8386, 113.8547 (location from UNFCCC CDM Registry)
GPPD ID
WRI1072350
Data source
UNFCCC CDM Registry · via WRI Global Power Plant Database (2021). Not found in current Global Energy Monitor trackers.

Electricity output

How much power this plant produces.

WRI Global Power Plant Database, 2013–2019.

ReportedEstimated
Latest annual output
182 GWh

Estimated · 2017

Capacity factor
35%

Output as a share of running at full power all year

Estimation method
CAPACITY-FACTOR-V1
Show data table
YearReported (GWh)Estimated (GWh)Capacity factorMethod
2013 — — — NO-ESTIMATION
2014 — — — NO-ESTIMATION
2015 — — — NO-ESTIMATION
2016 — — — NO-ESTIMATION
2017 — 181.83 35% CAPACITY-FACTOR-V1
2018 — — — —
2019 — — — —

How it compares

Size among operating gas plants.

In China
359th

of 470 gas plants · see all

In the world
3,952nd

of 5,616 · largest gas plants

This plantShenzhen Baoan Laohukeng Stage 2
60 MW
Average gas plantIn China, across 470 plants
434 MW
Largest in ChinaWangting power station
3.3 GW

14% of the average gas plant in China. About 2% of the size of the largest.

FAQ

About Shenzhen Baoan Laohukeng Stage 2.

How big is Shenzhen Baoan Laohukeng Stage 2?

It has 60 MW of operating capacity. That makes it the 359th largest gas plant in China and the 3,952nd largest in the world.

Where is Shenzhen Baoan Laohukeng Stage 2?

In China, at 22.8386, 113.8547.

How much electricity does Shenzhen Baoan Laohukeng Stage 2 generate?

An estimated 182 GWh was generated in 2017, a capacity factor of 35%, according to the WRI Global Power Plant Database.

What kind of power plant is Shenzhen Baoan Laohukeng Stage 2?

It is a gas power plant.

Is Shenzhen Baoan Laohukeng Stage 2 still operating?

Yes. 60 MW is in operation.

Sources and identifiers

  • Output 2013–2019WRI Global Power Plant Database v1.3.0 · WRI1072350
  • GPPD IDWRI1072350
  • WEPP ID1085090

Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.