All plants / China / Shandong
Shandong Zhanhua Rike Rubber and Plastic Technology solar project II
山东日科橡塑科技有限公司(二厂)二期分布式光伏发电项目
Zhanhua District · Binzhou · Shandong · China
- Operating capacity
- 2.3 MW
- Units
- 1
- Online since
- —
- Status
- Operating
Shandong Zhanhua Rike Rubber and Plastic Technology solar project II is a 2.3 MW solar power plant in Zhanhua District, Shandong, China.
By capacity it is the 9,590th largest of 13,289 operating solar plants in China.
- Owner
- —
- Coordinates
- 37.8325, 118.0923 (approximate)
- GEM plant ID
- L100001031463
Plant details
How this solar plant is built and run.
- Technology
- Assumed PV
How it compares
Size among operating solar plants.
- In Asia
- 18,599th
of 36,916
5% of the average solar plant in China. About 0% of the size of the largest.
FAQ
About Shandong Zhanhua Rike Rubber and Plastic Technology solar project II.
How big is Shandong Zhanhua Rike Rubber and Plastic Technology solar project II?
It has 2.3 MW of operating capacity. That makes it the 9,590th largest solar plant in China and the 40,106th largest in the world.
Where is Shandong Zhanhua Rike Rubber and Plastic Technology solar project II?
In Zhanhua District, Binzhou, Shandong, China, at 37.8325, 118.0923.
What kind of power plant is Shandong Zhanhua Rike Rubber and Plastic Technology solar project II?
It is a solar power plant using Assumed PV technology.
Is Shandong Zhanhua Rike Rubber and Plastic Technology solar project II still operating?
Yes. 2.3 MW is in operation.
What other power plants are near Shandong Zhanhua Rike Rubber and Plastic Technology solar project II?
At least 8 other plants are within 50 km. The nearest is Binzhou Zhanhua District Xinlili solar project, a 1.2 MW solar plant 0.0 km away.
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Solar Power Tracker (2026-02) · GEM Wiki page
- GEM plant IDL100001031463
- NEA unit IDPPD2012371603002N
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.