- Operating capacity
- 27 MW
- Units
- 2
- Online since
- 2018
- Age
- 8 yrs
Shandong Cao power station is a 27 MW waste-to-energy plant in Cao, Shandong, China.
It has 2 units, which came online between 2018 and 2021. By capacity it is the 257th largest of 764 operating waste-to-energy plants in China.
- Owner
- —
- Operator
- Shandong Caoxian Shengyuan Environmental Protection Power
- Coordinates
- 34.7989, 115.5876 (exact)
- GEM plant ID
- L100001018554
Plant details
How this waste-to-energy plant is built and run.
- Fuel
- Refuse (municipal and industrial wastes)
Timeline
When each unit started, retired, or is planned to retire.
- Operating
- Retired
- In development
- Until planned retirement
Units
2 units at this site.
| Unit | Capacity | Status | Start | Retired / planned | Technology |
|---|---|---|---|---|---|
| 1.0 | 15 MW | Operating | 2018 | — | — |
| 2.0 | 12 MW | Operating | 2021 | — | — |
How it compares
Size among operating waste-to-energy plants.
- In Asia
- 300th
- Age
- 8 yrs
of 874
Country average for waste-to-energy: 7 yrs
About average for China. About 10% of the size of the largest.
FAQ
About Shandong Cao power station.
How big is Shandong Cao power station?
It has 27 MW of operating capacity across 2 units. That makes it the 257th largest waste-to-energy plant in China and the 464th largest in the world.
Where is Shandong Cao power station?
In Cao, Heze, Shandong, China, at 34.7989, 115.5876.
When was Shandong Cao power station built?
Its first unit started in 2018 and its newest in 2021.
What kind of power plant is Shandong Cao power station?
It is a waste-to-energy plant, fuelled by refuse (municipal and industrial wastes).
Is Shandong Cao power station still operating?
Yes. 27 MW is in operation.
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Bioenergy Power Tracker (2026-10) · GEM Wiki page
- GEM plant IDL100001018554
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.