Global Power Plant Directory121,919 plants · 219 countries & territories

All plants / China / Shandong

Shandong Binzhou (Tianying) power station

滨州生活垃圾焚烧发电项目

WasteOperating

Binbei Residential District · Bincheng District · Binzhou · Shandong · China

Operating capacity
23 MW
Units
2
Online since
2015
Age
11 yrs

Shandong Binzhou (Tianying) power station is a 23 MW waste-to-energy plant in Binbei Residential District, Shandong, China.

It has 2 units, which came online between 2015 and 2018. By capacity it is the 343rd largest of 764 operating waste-to-energy plants in China.

Owner
—
Operator
Binzhou Tianying Environmental Protection Energy
Coordinates
37.5565, 118.0110 (exact)
GEM plant ID
L100001019491

Plant details

How this waste-to-energy plant is built and run.

Fuel
Refuse (municipal and industrial wastes)

Timeline

When each unit started, retired, or is planned to retire.

  • Operating
  • Retired
  • In development
  • Until planned retirement

Units

2 units at this site.

UnitCapacityStatusStartRetired / plannedTechnology
1.0 15 MW Operating 2015——
2.0 7.5 MW Operating 2018——

How it compares

Size among operating waste-to-energy plants.

In China
343rd

of 764 waste-to-energy plants · see all

In Asia
403rd

of 874

In the world
602nd

of 1,963 · largest waste-to-energy plants

Age
11 yrs

Country average for waste-to-energy: 7 yrs

This plantShandong Binzhou (Tianying) power station
23 MW
Average waste-to-energy plantIn China, across 764 plants
29 MW

77% of the average waste-to-energy plant in China. About 8% of the size of the largest.

FAQ

About Shandong Binzhou (Tianying) power station.

How big is Shandong Binzhou (Tianying) power station?

It has 23 MW of operating capacity across 2 units. That makes it the 343rd largest waste-to-energy plant in China and the 602nd largest in the world.

Where is Shandong Binzhou (Tianying) power station?

In Binbei Residential District, Bincheng District, Binzhou, Shandong, China, at 37.5565, 118.0110.

When was Shandong Binzhou (Tianying) power station built?

Its first unit started in 2015 and its newest in 2018.

What kind of power plant is Shandong Binzhou (Tianying) power station?

It is a waste-to-energy plant, fuelled by refuse (municipal and industrial wastes).

Is Shandong Binzhou (Tianying) power station still operating?

Yes. 23 MW is in operation.

Sources and identifiers

  • Plant dataGlobal Energy Monitor, Global Bioenergy Power Tracker (2026-10) · GEM Wiki page
  • GEM plant IDL100001019491

Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.