All plants / United States / Texas
San Jacinto County peaking facility
Shepherd · San Jacinto · Texas · United States
- Operating capacity
- 170 MW
- Units
- 2
- Online since
- 2001
- Age
- 25 yrs
San Jacinto County peaking facility is a 170 MW gas power plant in Shepherd, Texas, United States.
It has 2 units, online since 2001. It uses gas turbine technology burning natural gas. It is owned mainly by East Texas Electric Cooperative Inc. By capacity it is the 794th largest of 1,861 operating gas plants in the United States.
- Owner
- East Texas Electric Cooperative Inc
East Texas Electric Cooperative Inc [100%]
- Parent company
- East Texas Electric Cooperative Inc [100.0%]
- Coordinates
- 30.4193, -95.0118 (exact)
- GEM plant ID
- L100000401895
Plant details
How this gas plant is built and run.
- Technology
- Gas turbine
- Fuel
- Fossil gas: natural gas
- Fuel classification
- Gas
- Combined heat and power
- No
Timeline
When each unit started, retired, or is planned to retire.
- Operating
- Retired
- In development
- Until planned retirement
Who owns it
Direct owners, and the owners at the top of each chain, as a share of operating capacity.
Direct owners
- East Texas Electric Cooperative Company100%
Ownership chain
- member/employee owned Individualsowns 100% of East Texas Electric Cooperative
- East Texas Electric Cooperative Companyowns 100% of this plant
Ultimately owned by
- member/employee owned Individuals100%
No share traced to a government or state body.
See every plant owned by
Source: Global Energy Monitor, Global Energy Ownership Tracker, September 2026 (CC BY 4.0). Capacity is weighted by each owner’s share.
Units
2 units at this site.
| Unit | Capacity | Status | Start | Retired / planned | Technology | Turbine or engine |
|---|---|---|---|---|---|---|
| SJC1 | 85 MW | Operating | 2001 | — | Gas turbine | — |
| SJC2 | 85 MW | Operating | 2001 | — | Gas turbine | — |
Electricity output
How much power this plant produces.
WRI Global Power Plant Database, 2013–2019.
- Latest annual output
- 156 GWh
- Capacity factor
- 10%
- Reported by
- U.S. Energy Information Administration
Reported · 2019
Output as a share of running at full power all year
Show data table
| Year | Reported (GWh) | Estimated (GWh) | Capacity factor | Method |
|---|---|---|---|---|
| 2013 | 220.43 | — | 15% | NO-ESTIMATION |
| 2014 | 324.19 | — | 22% | NO-ESTIMATION |
| 2015 | 0.00 | — | 0% | NO-ESTIMATION |
| 2016 | 0.00 | — | 0% | NO-ESTIMATION |
| 2017 | 0.00 | 599.50 | 0% | CAPACITY-FACTOR-V1 |
| 2018 | 0.00 | — | 0% | — |
| 2019 | 155.54 | — | 10% | — |
How it compares
Size among operating gas plants.
- Age
- 25 yrs
Country average for gas: 27 yrs
51% of the average gas plant in the United States. About 4% of the size of the largest.
FAQ
About San Jacinto County peaking facility.
Who owns San Jacinto County peaking facility?
Its main owner is East Texas Electric Cooperative Inc.
How big is San Jacinto County peaking facility?
It has 170 MW of operating capacity across 2 units. That makes it the 794th largest gas plant in the United States and the 2,775th largest in the world.
Where is San Jacinto County peaking facility?
In Shepherd, San Jacinto, Texas, United States, at 30.4193, -95.0118.
When was San Jacinto County peaking facility built?
It started operating in 2001.
How much electricity does San Jacinto County peaking facility generate?
It reported 156 GWh in 2019, a capacity factor of 10%, according to the WRI Global Power Plant Database.
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Oil and Gas Plant Tracker (2026-08) · GEM Wiki page
- OwnershipGlobal Energy Monitor, Global Energy Ownership Tracker, September 2026
- Output 2013–2019WRI Global Power Plant Database v1.3.0 · USA0056603
- GEM plant IDL100000401895
- WEPP ID58647
- EIA plant ID56603
- EIA unit IDSJC1
- EIA unit IDSJC2
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.