Global Power Plant Directory121,919 plants · 219 countries & territories

All plants / France / Nouvelle-Aquitaine

Rives Charentaises wind farm

WindOperatingOnshore

Lizant · Vienne · Nouvelle-Aquitaine · France

Operating capacity
37 MW
Units
6
Online since
2023
Age
3 yrs

Rives Charentaises wind farm is a 37 MW wind power plant in Lizant, Nouvelle-Aquitaine, France.

It has 6 units, online since 2023. It is owned mainly by Voltalia SA and operated by Voltalia. By capacity it is the 101st largest of 1,588 operating wind plants in France.

Owner
Voltalia SA

Voltalia SA [100%]

Operator
Voltalia
Coordinates
46.0829, 0.2829 (approximate)
GEM plant ID
L100000919922

Plant details

How this wind plant is built and run.

Installation
Onshore

Timeline

When each unit started, retired, or is planned to retire.

  • Operating
  • Retired
  • In development
  • Until planned retirement

Units

6 units at this site.

UnitCapacityStatusStartTechnology
1.0 (small unit) 6.2 MW Operating 2023Onshore
2.0 (small unit) 6.2 MW Operating 2023Onshore
3.0 (small unit) 6.2 MW Operating 2023Onshore
4.0 (small unit) 6.2 MW Operating 2023Onshore
5.0 (small unit) 6.2 MW Operating 2023Onshore
6.0 (small unit) 6.2 MW Operating 2023Onshore

How it compares

Size among operating wind plants.

In France
101st

of 1,588 wind plants · see all

In Europe
1,546th

of 7,126

In the world
8,670th

of 17,121 · largest wind plants

Age
3 yrs

Country average for wind: 12 yrs

This plantRives Charentaises wind farm
37 MW
Average wind plantIn France, across 1,588 plants
18 MW
Largest in FranceFecamp wind farm
498 MW

2.0× the average wind plant in France. About 7% of the size of the largest.

FAQ

About Rives Charentaises wind farm.

Who owns Rives Charentaises wind farm?

Its main owner is Voltalia SA. It is operated by Voltalia.

How big is Rives Charentaises wind farm?

It has 37 MW of operating capacity across 6 units. That makes it the 101st largest wind plant in France and the 8,670th largest in the world.

Where is Rives Charentaises wind farm?

In Lizant, Vienne, Nouvelle-Aquitaine, France, at 46.0829, 0.2829.

When was Rives Charentaises wind farm built?

It started operating in 2023.

What kind of power plant is Rives Charentaises wind farm?

It is a wind power plant using Onshore technology.

Sources and identifiers

  • Plant dataGlobal Energy Monitor, Global Wind Power Tracker (2026-02) · GEM Wiki page
  • GEM plant IDL100000919922

Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.