Qinghai Golmud (Three Gorges) 1100 MW solar power plant

三峡能源青海格尔木1100MW光伏光热项目1000MW光伏

SolarOperatingSolar Thermal, PV

Wutumeiren Town · Golmud City · Haixi AP · Qinghai · China

Operating capacity
1.1 GW
Units
2
Online since
2023
Age
3 yrs

Qinghai Golmud (Three Gorges) 1100 MW solar power plant is a 1.1 GW solar power plant in Wutumeiren Town, Qinghai, China.

It has 2 units, which came online between 2023 and 2025. It is owned mainly by China Three Gorges Renewables (Group) Co Ltd and operated by Three Gorges New Energy Golmud Power Generation. By capacity it is the 31st largest of 13,289 operating solar plants in China.

Owner
China Three Gorges Renewables (Group) Co Ltd

China Three Gorges Renewables (Group) Co Ltd [100%]

Operator
Three Gorges New Energy Golmud Power Generation
Coordinates
36.8302, 93.2901 (approximate)
GEM plant ID
L100000810943

Plant details

How this solar plant is built and run.

Technology
PV, Solar Thermal
Capacity rating
MWac (grid-connection AC capacity)
Battery storage on site
Yes

Timeline

When each unit started, retired, or is planned to retire.

  • Operating
  • Retired
  • In development
  • Until planned retirement

Units

2 units at this site.

UnitCapacityStatusStartTechnology
Photovoltaic 1.0 GW Operating 2023PV
Solar Thermal 100 MW Operating 2025Solar Thermal

How it compares

Size among operating solar plants.

In China
31st

of 13,289 solar plants · see all

In Asia
43rd

of 36,916

In the world
44th

of 79,372 · largest solar plants

Age
3 yrs

Country average for solar: 8 yrs

This plantQinghai Golmud (Three Gorges) 1100 MW solar power plant
1.1 GW
Average solar plantIn China, across 13,289 plants
48 MW

23× the average solar plant in China. About 28% of the size of the largest.

FAQ

About Qinghai Golmud (Three Gorges) 1100 MW solar power plant.

Who owns Qinghai Golmud (Three Gorges) 1100 MW solar power plant?

Its main owner is China Three Gorges Renewables (Group) Co Ltd. It is operated by Three Gorges New Energy Golmud Power Generation.

How big is Qinghai Golmud (Three Gorges) 1100 MW solar power plant?

It has 1.1 GW of operating capacity across 2 units. That makes it the 31st largest solar plant in China and the 44th largest in the world.

Where is Qinghai Golmud (Three Gorges) 1100 MW solar power plant?

In Wutumeiren Town, Golmud City, Haixi AP, Qinghai, China, at 36.8302, 93.2901.

When was Qinghai Golmud (Three Gorges) 1100 MW solar power plant built?

Its first unit started in 2023 and its newest in 2025.

What kind of power plant is Qinghai Golmud (Three Gorges) 1100 MW solar power plant?

It is a solar power plant using PV technology.

Sources and identifiers

  • Plant dataGlobal Energy Monitor, Global Solar Power Tracker (2026-02) · GEM Wiki page
  • GEM plant IDL100000810943
  • OpenCSP unit ID154

Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.