All plants / Bangladesh / Barisal
Patuakhali power station (RPCL/NORINCO)
Londa · Kalapara · Patuakhali · Barisal · Bangladesh
- Operating capacity
- 1.3 GW
- Units
- 4
- Online since
- 2025
- CO₂ a year
- 3.4 Mt
Patuakhali power station (RPCL/NORINCO) is a 1.3 GW coal power plant in Londa, Barisal, Bangladesh.
It has 4 units, online since 2025. Its boilers are ultra-supercritical. It is owned mainly by Rural Power Company Ltd. Traced to the top of the ownership chain, its largest owner is Government of Bangladesh (50%). Global Energy Monitor estimates it emits about 3.4 million tonnes of CO₂ a year. By capacity it is the largest of 7 operating coal plants in Bangladesh.
- Owner
- Rural Power Company Ltd
Rural Power Company Ltd [50%]; Norinco [50%]
- Parent company
- Norinco [50.0%]; Rural Power Company Ltd [50.0%]
- Coordinates
- 22.0251, 90.3123 (exact)
- GEM plant ID
- L100000100057
Plant details
How this coal plant is built and run.
- Combustion technology
- Ultra-supercritical
- Coal source
- Imported
- Coal supply notes
- imported
- State ownership
- 50% · partial state-owned enterprise
Climate
Carbon dioxide from this plant, as estimated by Global Energy Monitor.
- CO₂ a year
- 3.39 Mt
- CO₂ over remaining life
- 115 Mt
- Capacity factor
- 35%
- Efficiency
- 41%
Million tonnes, operating units
Up to 34 more years of operation
Country average GEM assumes for its coal fleet, not this plant's own figure
From a heat rate of 8,272 Btu/kWh
Timeline
When each unit started, retired, or is planned to retire.
- Operating
- Retired
- In development
- Until planned retirement
Who owns it
Direct owners, and the owners at the top of each chain, as a share of operating capacity.
Direct owners
- Rural Power Company Company50%
- Norinco Company50%
Ownership chain
- Government of Bangladesh Governmentowns 100% of Rural Power Company
- Rural Power Company Companyowns 50% of this plant
Ultimately owned by
- Government of Bangladesh Government50%
- Norinco Company50%
At least 50% traced to a government or state body.
See every plant owned by
Source: Global Energy Monitor, Global Energy Ownership Tracker, September 2026 (CC BY 4.0). Capacity is weighted by each owner’s share.
Units
4 units at this site.
| Unit | Capacity | Status | Start | Retired / planned | Technology | Coal | CO₂ a year |
|---|---|---|---|---|---|---|---|
| Phase I Unit 1 | 660 MW | Operating | 2025 | — | Ultra-supercritical | — | 1.70 Mt |
| Phase I Unit 2 | 660 MW | Operating | 2025 | — | Ultra-supercritical | — | 1.70 Mt |
| Phase II Unit 1 | 660 MW | Cancelled | 2031 | — | — | — | — |
| Phase II Unit 2 | 660 MW | Cancelled | 2031 | — | — | — | — |
How it compares
Size among operating coal plants.
- In Asia
- 394th
- Age
- 1 yrs
of 1,872
Country average for coal: 6 yrs
1.3× the average coal plant in Bangladesh. The largest coal plant in Bangladesh.
FAQ
About Patuakhali power station (RPCL/NORINCO).
Who owns Patuakhali power station (RPCL/NORINCO)?
Its main owner is Rural Power Company Ltd. Traced to the top of each ownership chain, its owners are Government of Bangladesh (50%) and Norinco (50%).
How big is Patuakhali power station (RPCL/NORINCO)?
It has 1.3 GW of operating capacity across 4 units. That makes it the largest coal plant in Bangladesh and the 509th largest in the world.
Where is Patuakhali power station (RPCL/NORINCO)?
In Londa, Kalapara, Patuakhali, Barisal, Bangladesh, at 22.0251, 90.3123.
When was Patuakhali power station (RPCL/NORINCO) built?
It started operating in 2025.
How much CO₂ does Patuakhali power station (RPCL/NORINCO) emit?
Global Energy Monitor estimates about 3.4 million tonnes of CO₂ a year, and 115 million tonnes over the rest of its expected life.
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Coal Plant Tracker (2026-07) · GEM Wiki page
- OwnershipGlobal Energy Monitor, Global Energy Ownership Tracker, September 2026
- GEM plant IDL100000100057
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.