- Operating capacity
- 12 MW
- Units
- 2
- Online since
- 2005
- Age
- 21 yrs
Passarinho wind farm is a 12 MW wind power plant in Lisboa, Lisbon, Portugal.
It has 2 units, which came online between 2005 and 2009. It is owned mainly by Acciona Energía SAU. By capacity it is the 113th largest of 234 operating wind plants in Portugal.
- Owner
- Acciona Energía SAU
- Coordinates
- 38.9820, -9.1740 (exact)
- GEM plant ID
- L100000920655
Plant details
How this wind plant is built and run.
- Installation
- Onshore
Timeline
When each unit started, retired, or is planned to retire.
- Operating
- Retired
- In development
- Until planned retirement
Units
2 units at this site.
| Unit | Capacity | Status | Start | Technology |
|---|---|---|---|---|
| 1.0 (small unit) | 8.0 MW | Operating | 2005 | Onshore |
| 2.0 (small unit) | 4.0 MW | Operating | 2009 | Onshore |
Electricity output
How much power this plant produces.
WRI Global Power Plant Database, 2013–2019.
- Latest annual output
- 24 GWh
- Capacity factor
- 23%
- Estimation method
- Wind model
Estimated · 2017
Output as a share of running at full power all year
Show data table
| Year | Reported (GWh) | Estimated (GWh) | Capacity factor | Method |
|---|---|---|---|---|
| 2013 | — | 31.31 | 30% | WIND-V1 |
| 2014 | — | 28.92 | 28% | WIND-V1 |
| 2015 | — | 28.99 | 28% | WIND-V1 |
| 2016 | — | 27.34 | 26% | WIND-V1 |
| 2017 | — | 24.07 | 23% | WIND-V1 |
| 2018 | — | — | — | — |
| 2019 | — | — | — | — |
How it compares
Size among operating wind plants.
- In Europe
- 5,144th
- Age
- 21 yrs
of 7,126
Country average for wind: 18 yrs
46% of the average wind plant in Portugal. About 4% of the size of the largest.
FAQ
About Passarinho wind farm.
Who owns Passarinho wind farm?
Its main owner is Acciona Energía SAU.
How big is Passarinho wind farm?
It has 12 MW of operating capacity across 2 units. That makes it the 113th largest wind plant in Portugal and the 13,996th largest in the world.
Where is Passarinho wind farm?
In Lisboa, Lisbon, Portugal, at 38.9820, -9.1740.
When was Passarinho wind farm built?
Its first unit started in 2005 and its newest in 2009.
How much electricity does Passarinho wind farm generate?
An estimated 24 GWh was generated in 2017, a capacity factor of 23%, according to the WRI Global Power Plant Database.
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Wind Power Tracker (2026-02) · GEM Wiki page
- Output 2013–2019WRI Global Power Plant Database v1.3.0 · WRI1023407
- GEM plant IDL100000920655
- WEPP ID1069343
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.