Global Power Plant Directory121,919 plants · 219 countries & territories

All plants / United States / North Carolina

Partin Solar

SolarOperatingPV

Elkin · Surry County · North Carolina · United States

Operating capacity
50 MW
Units
1
Online since
2023
Age
3 yrs

Partin Solar is a 50 MW solar power plant in Elkin, North Carolina, United States.

It has been operating since 2023. It is owned mainly by Southern Current LLC and operated by Southern Current. By capacity it is the 817th largest of 6,708 operating solar plants in the United States.

Owner
Southern Current LLC

Southern Current LLC [100%]

Operator
Southern Current
Coordinates
36.2680, -80.8219 (exact)
GEM plant ID
L100000805406

Plant details

How this solar plant is built and run.

Technology
PV
Capacity rating
MWac (grid-connection AC capacity)

How it compares

Size among operating solar plants.

In the United States
817th

of 6,708 solar plants · see all

In Americas
1,090th

of 11,032

In the world
4,993rd

of 79,372 · largest solar plants

Age
3 yrs

Country average for solar: 7 yrs

This plantPartin Solar
50 MW
Average solar plantIn the United States, across 6,708 plants
23 MW
Largest in the United StatesEdwards Sanborn solar farm
957 MW

2.2× the average solar plant in the United States. About 5% of the size of the largest.

FAQ

About Partin Solar.

Who owns Partin Solar?

Its main owner is Southern Current LLC. It is operated by Southern Current.

How big is Partin Solar?

It has 50 MW of operating capacity. That makes it the 817th largest solar plant in the United States and the 4,993rd largest in the world.

Where is Partin Solar?

In Elkin, Surry County, North Carolina, United States, at 36.2680, -80.8219.

When was Partin Solar built?

It started operating in 2023.

What kind of power plant is Partin Solar?

It is a solar power plant using PV technology.

Sources and identifiers

  • Plant dataGlobal Energy Monitor, Global Solar Power Tracker (2026-02) · GEM Wiki page
  • GEM plant IDL100000805406
  • EIA plant ID63827

Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.