Global Power Plant Directory121,919 plants · 219 countries & territories

All plants / India / Odisha

Paradip power station

CoalOperatingSubcritical

Musadia · Peradip · Jagatsinghapur · Odisha · India

Operating capacity
120 MW
Units
4
Online since
2015
CO₂ a year
0.8 Mt

Paradip power station is a 120 MW coal power plant in Musadia, Odisha, India.

It has 4 units, which came online between 2015 and 2022. Its boilers are subcritical. It is owned mainly by Essar Power Ltd. Global Energy Monitor estimates it emits about 0.8 million tonnes of CO₂ a year. By capacity it is the 227th largest of 341 operating coal plants in India.

Owner
Essar Power Ltd

Essar Power Ltd [100%]

Parent company
Essar Energy Ltd [81.0%]; unknown [19.0%]
Coordinates
20.3122, 86.6458 (exact)
GEM plant ID
L100000102487

Plant details

How this coal plant is built and run.

Combustion technology
Subcritical
Coal source
Imported
Permit
November 17, 2011

Climate

Carbon dioxide from this plant, as estimated by Global Energy Monitor.

CO₂ a year
0.77 Mt

Million tonnes, operating units

CO₂ over remaining life
21 Mt

Up to 31 more years of operation

Capacity factor
66%

Country average GEM assumes for its coal fleet, not this plant's own figure

Efficiency
31%

From a heat rate of 10,878 Btu/kWh

Retirement and national pledges

Planned retirement
Not announced
Coal phase-out pledge
None recorded
Net-zero target
2070in 44 years

No retirement date has been announced, so nothing yet ties the plant to India’s 2070 net-zero target. Pledges are national commitments recorded by Global Energy Monitor.

Timeline

When each unit started, retired, or is planned to retire.

  • Operating
  • Retired
  • In development
  • Until planned retirement

Who owns it

Direct owners, and the owners at the top of each chain, as a share of operating capacity.

Direct owners

Ownership chain

  1. small shareholder(s) Unidentified ownersowns 60.1% of ArcelorMittal
  2. ArcelorMittal Companyowns 60% of ArcelorMittal Nippon Steel India
  3. ArcelorMittal Nippon Steel India Companyowns 50% of this plant

Ultimately owned by

  • natural person(s) Individuals57.4%
  • small shareholder(s) Unidentified owners36.3%
  • Share not traceable4.5%
  • member/employee owned Individuals1.5%

No share traced to a government or state body.

Source: Global Energy Monitor, Global Energy Ownership Tracker, September 2026 (CC BY 4.0). Capacity is weighted by each owner’s share.

Units

4 units at this site.

UnitCapacityStatusStartRetired / plannedTechnologyCoalCO₂ a year
Unit 1 30 MW Operating 2015—Subcritical—0.20 Mt
Unit 2 30 MW Operating 2016—Subcritical—0.20 Mt
Unit 3 30 MW Operating 2022—Subcritical—0.18 Mt
Unit 4 30 MW Operating 2022—Subcritical—0.18 Mt

How it compares

Size among operating coal plants.

In India
227th

of 341 coal plants · see all

In Asia
1,512th

of 1,872

In the world
1,990th

of 2,643 · largest coal plants

Age
11 yrs

Country average for coal: 20 yrs

This plantParadip power station
120 MW
Average coal plantIn India, across 341 plants
770 MW
4.8 GW

16% of the average coal plant in India. About 3% of the size of the largest.

FAQ

About Paradip power station.

Who owns Paradip power station?

Its main owner is Essar Power Ltd.

How big is Paradip power station?

It has 120 MW of operating capacity across 4 units. That makes it the 227th largest coal plant in India and the 1,990th largest in the world.

Where is Paradip power station?

In Musadia, Peradip, Jagatsinghapur, Odisha, India, at 20.3122, 86.6458.

When was Paradip power station built?

Its first unit started in 2015 and its newest in 2022.

How much CO₂ does Paradip power station emit?

Global Energy Monitor estimates about 0.8 million tonnes of CO₂ a year, and 21 million tonnes over the rest of its expected life.

Sources and identifiers

Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.