- Operating capacity
- 22 MW
- Units
- 2
- Online since
- 2007
- Age
- 19 yrs
Omissy wind farm is a 22 MW wind power plant in Aisne, Hauts-de-France, France.
It has 2 units, which came online between 2007 and 2008. It is owned mainly by Eurowatt Services. By capacity it is the 331st largest of 1,588 operating wind plants in France.
- Owner
- Eurowatt Services
Eurowatt Services [100%]
- Operator
- Eurowatt Services
- Coordinates
- 49.8990, 3.2852 (exact)
- GEM plant ID
- L100000908077
Plant details
How this wind plant is built and run.
- Installation
- Onshore
Timeline
When each unit started, retired, or is planned to retire.
- Operating
- Retired
- In development
- Until planned retirement
Units
2 units at this site.
| Unit | Capacity | Status | Start | Technology |
|---|---|---|---|---|
| 1.0 | 12 MW | Operating | 2007 | Onshore |
| 2.0 | 10 MW | Operating | 2008 | Onshore |
Electricity output
How much power this plant produces.
WRI Global Power Plant Database, 2013–2019.
- Latest annual output
- 22 GWh
- Capacity factor
- 11%
- Estimation method
- CAPACITY-FACTOR-V1
Estimated · 2017
Output as a share of running at full power all year
Show data table
| Year | Reported (GWh) | Estimated (GWh) | Capacity factor | Method |
|---|---|---|---|---|
| 2013 | — | — | — | NO-ESTIMATION |
| 2014 | — | — | — | NO-ESTIMATION |
| 2015 | — | — | — | NO-ESTIMATION |
| 2016 | — | — | — | NO-ESTIMATION |
| 2017 | — | 21.94 | 11% | CAPACITY-FACTOR-V1 |
| 2018 | — | — | — | — |
| 2019 | — | — | — | — |
How it compares
Size among operating wind plants.
- In Europe
- 3,036th
- Age
- 19 yrs
of 7,126
Country average for wind: 12 yrs
1.2× the average wind plant in France. About 4% of the size of the largest.
FAQ
About Omissy wind farm.
Who owns Omissy wind farm?
Its main owner is Eurowatt Services.
How big is Omissy wind farm?
It has 22 MW of operating capacity across 2 units. That makes it the 331st largest wind plant in France and the 11,142nd largest in the world.
Where is Omissy wind farm?
In Aisne, Hauts-de-France, France, at 49.8990, 3.2852.
When was Omissy wind farm built?
Its first unit started in 2007 and its newest in 2008.
How much electricity does Omissy wind farm generate?
An estimated 22 GWh was generated in 2017, a capacity factor of 11%, according to the WRI Global Power Plant Database.
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Wind Power Tracker (2026-02) · GEM Wiki page
- Output 2013–2019WRI Global Power Plant Database v1.3.0 · WRI1024226
- GEM plant IDL100000908077
- WEPP ID1080973
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.