Novaky power station

CoalRetiredSubcritical

Nováky · Prievidza · Trenčiansky · Slovakia

Capacity
472 MW
Units
5
Online since
—
Output a year
1.2 TWh

Novaky power station is a retired 472 MW coal power plant in Nováky, Trenčiansky, Slovakia.

It has 5 units, which came online between 1957 and 1976. Its boilers are subcritical, burning lignite coal. It is owned mainly by Slovenské Elektrárne AŞ. Traced to the top of the ownership chain, its largest owner is Government of Slovakia (34%).

Owner
Slovenské Elektrárne AŞ

Slovenské Elektrárne AŞ [100%]

Parent company
Ministry of Economy (Slovakia) [34.0%]; Enel SpA [33.0%]; EP Slovakia BV [33.0%]
Retired
472 MW (last in 2023)
Coordinates
48.6988, 18.5335 (exact)
GEM plant ID
L100000103415

Plant details

How this coal plant is built and run.

Combustion technology
Subcritical
Coal type
Lignite
Combined heat and power
Yes
State ownership
42% · partial state-owned enterprise

Timeline

When each unit started, retired, or is planned to retire.

  • Operating
  • Retired
  • In development
  • Until planned retirement

Who owns it

Direct owners, and the owners at the top of each chain.

Direct owners

Ownership chain

  1. small shareholder(s) Unidentified ownersowns 71.2% of Enel
  2. Enel Companyowns 100% of Enel Italia
  3. Enel Italia Companyowns 100% of Enel Produzione
  4. Enel Produzione Companyowns 50% of Slovak Power Holding
  5. Slovak Power Holding Companyowns 66% of Slovenské Elektrárne
  6. Slovenské Elektrárne Companyowns 100% of this plant

Ultimately owned by

At least 41.8% traced to a government or state body.

Source: Global Energy Monitor, Global Energy Ownership Tracker, September 2026 (CC BY 4.0). Capacity is weighted by each owner’s share.

Units

5 units at this site.

UnitCapacityStatusStartRetired / plannedTechnologyCoalCO₂ a year
Phase A Unit 3 32 MW Retired 19572013SubcriticalLignite—
Phase B Unit 1 110 MW Retired 19642023SubcriticalLignite—
Phase B Unit 2 110 MW Retired 19642023SubcriticalLignite—
Phase B Unit 3 110 MW Retired 19762015SubcriticalLignite—
Phase B Unit 4 110 MW Retired 19762015SubcriticalLignite—

Electricity output

How much power this plant produces.

WRI Global Power Plant Database, 2013–2019.

ReportedEstimated
Latest annual output
1.2 TWh

Estimated · 2017

Capacity factor
29%

Output as a share of running at full power all year

Estimation method
CAPACITY-FACTOR-V1
Show data table
YearReported (GWh)Estimated (GWh)Capacity factorMethod
2013 — — — NO-ESTIMATION
2014 — — — NO-ESTIMATION
2015 — — — NO-ESTIMATION
2016 — — — NO-ESTIMATION
2017 — 1,187.64 29% CAPACITY-FACTOR-V1
2018 — — — —
2019 — — — —

FAQ

About Novaky power station.

Who owns Novaky power station?

Its main owner is Slovenské Elektrárne AŞ. Traced to the top of each ownership chain, its owners are Government of Slovakia (34%), EP Slovakia (33%) and Ministry of Economy and Finance (Italy) (8%).

How big is Novaky power station?

It has 472 MW of capacity across 5 units.

Is Novaky power station still operating?

No. It has been retired since 2023.

Where is Novaky power station?

In Nováky, Prievidza, Trenčiansky, Slovakia, at 48.6988, 18.5335.

When was Novaky power station built?

Its first unit started in 1957 and its newest in 1976.

Sources and identifiers