- Operating capacity
- 152 MW
- Units
- 2
- Online since
- 2009
- Age
- 17 yrs
Notrees Windpower Hybrid is a 152 MW wind power plant in Winkler County, Texas, United States.
It has 2 units, online since 2009. It is owned mainly by Duke Energy Corp and operated by Duke Energy. By capacity it is the 536th largest of 1,465 operating wind plants in the United States.
- Owner
- Duke Energy Corp
Duke Energy Corp [100%]
- Operator
- Duke Energy
- Coordinates
- 31.9667, -102.8090 (exact)
- GEM plant ID
- L100000906746
Plant details
How this wind plant is built and run.
- Installation
- Onshore
Timeline
When each unit started, retired, or is planned to retire.
- Operating
- Retired
- In development
- Until planned retirement
Units
2 units at this site.
| Unit | Capacity | Status | Start | Technology |
|---|---|---|---|---|
| 1.0 | 92 MW | Operating | 2009 | Onshore |
| 2.0 | 60 MW | Operating | 2009 | Onshore |
Electricity output
How much power this plant produces.
WRI Global Power Plant Database, 2013–2019.
- Latest annual output
- 394 GWh
- Capacity factor
- 30%
- Reported by
- U.S. Energy Information Administration
Reported · 2019
Output as a share of running at full power all year
Show data table
| Year | Reported (GWh) | Estimated (GWh) | Capacity factor | Method |
|---|---|---|---|---|
| 2013 | 0.00 | 581.96 | 0% | WIND-V1 |
| 2014 | 0.00 | 568.60 | 0% | WIND-V1 |
| 2015 | 389.74 | 515.21 | 29% | WIND-V1 |
| 2016 | 411.82 | 533.72 | 31% | WIND-V1 |
| 2017 | 422.50 | 533.76 | 32% | WIND-V1 |
| 2018 | 396.78 | — | 30% | — |
| 2019 | 394.34 | — | 30% | — |
How it compares
Size among operating wind plants.
- In Americas
- 588th
- Age
- 17 yrs
of 1,910
Country average for wind: 13 yrs
About average for the United States. About 14% of the size of the largest.
FAQ
About Notrees Windpower Hybrid.
Who owns Notrees Windpower Hybrid?
Its main owner is Duke Energy Corp. It is operated by Duke Energy.
How big is Notrees Windpower Hybrid?
It has 152 MW of operating capacity across 2 units. That makes it the 536th largest wind plant in the United States and the 1,886th largest in the world.
Where is Notrees Windpower Hybrid?
In Winkler County, Texas, United States, at 31.9667, -102.8090.
When was Notrees Windpower Hybrid built?
It started operating in 2009.
How much electricity does Notrees Windpower Hybrid generate?
It reported 394 GWh in 2019, a capacity factor of 30%, according to the WRI Global Power Plant Database.
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Wind Power Tracker (2026-02) · GEM Wiki page
- Output 2013–2019WRI Global Power Plant Database v1.3.0 · USA0056961
- GEM plant IDL100000906746
- WEPP ID55701
- EIA plant ID56961
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.