Global Power Plant Directory121,919 plants · 219 countries & territories

All plants / France

Néoules solar farm

SolarOperatingPV

Provence-Alpes-Côte d'Azur · France

Operating capacity
24 MW
Units
1
Online since
2012
Age
14 yrs

Néoules solar farm is a 24 MW solar power plant in Provence-Alpes-Côte d'Azur, France.

It has been operating since 2012. It is owned mainly by Akuo Energy SAS and operated by Akuo Energy. By capacity it is the 68th largest of 2,430 operating solar plants in France.

Owner
Akuo Energy SAS

Akuo Energy SAS [100%]

Operator
Akuo Energy
Coordinates
43.2949, 6.0291 (approximate)
GEM plant ID
L100000816896

Plant details

How this solar plant is built and run.

Technology
PV
Capacity rating
MWp/dc (panel DC capacity)

Electricity output

How much power this plant produces.

WRI Global Power Plant Database, 2013–2019.

ReportedEstimated
Latest annual output
45 GWh

Estimated · 2017

Capacity factor
22%

Output as a share of running at full power all year

Estimation method
Solar model
Show data table
YearReported (GWh)Estimated (GWh)Capacity factorMethod
2013 — 38.56 18% SOLAR-V1-NO-AGE
2014 — 39.75 19% SOLAR-V1-NO-AGE
2015 — 42.15 20% SOLAR-V1-NO-AGE
2016 — 41.93 20% SOLAR-V1-NO-AGE
2017 — 45.30 22% SOLAR-V1-NO-AGE
2018 — — — —
2019 — — — —

How it compares

Size among operating solar plants.

In France
68th

of 2,430 solar plants · see all

In Europe
995th

of 28,467

In the world
8,448th

of 79,372 · largest solar plants

Age
14 yrs

Country average for solar: 7 yrs

This plantNéoules solar farm
24 MW
Average solar plantIn France, across 2,430 plants
5.9 MW
Largest in FranceCestas solar farm
300 MW

4.1× the average solar plant in France. About 8% of the size of the largest.

FAQ

About Néoules solar farm.

Who owns Néoules solar farm?

Its main owner is Akuo Energy SAS. It is operated by Akuo Energy.

How big is Néoules solar farm?

It has 24 MW of operating capacity. That makes it the 68th largest solar plant in France and the 8,448th largest in the world.

Where is Néoules solar farm?

In Provence-Alpes-Côte d'Azur, France, at 43.2949, 6.0291.

When was Néoules solar farm built?

It started operating in 2012.

How much electricity does Néoules solar farm generate?

An estimated 45 GWh was generated in 2017, a capacity factor of 22%, according to the WRI Global Power Plant Database.

Sources and identifiers

  • Plant dataGlobal Energy Monitor, Global Solar Power Tracker (2026-02) · GEM Wiki page
  • Output 2013–2019WRI Global Power Plant Database v1.3.0 · WRI1023997
  • GEM plant IDL100000816896
  • ODRE unit ID17W100P100P08045
  • ODRE unit ID17W100P100P3050F

Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.