- Operating capacity
- 6.5 MW
- Units
- 1
- Online since
- —
- Status
- Operating
Metheringham Heath (Farm AD) is a 6.5 MW bioenergy power plant in the United Kingdom.
It is owned mainly by Future Biogas (Blankney Estate). By capacity it is the 55th largest of 214 operating bioenergy plants in the United Kingdom.
- Commissioned
- —
- Coordinates
- 53.1334, -0.4721 (location from UK Renewable Energy Planning Database)
- GPPD ID
- GBR0000331
- Data source
- UK Renewable Energy Planning Database · via WRI Global Power Plant Database (2021). Not found in current Global Energy Monitor trackers.
How it compares
Size among operating bioenergy plants.
30% of the average bioenergy plant in the United Kingdom. About 0% of the size of the largest.
FAQ
About Metheringham Heath (Farm AD).
Who owns Metheringham Heath (Farm AD)?
Its main owner is Future Biogas (Blankney Estate).
How big is Metheringham Heath (Farm AD)?
It has 6.5 MW of operating capacity. That makes it the 55th largest bioenergy plant in the United Kingdom and the 2,101st largest in the world.
Where is Metheringham Heath (Farm AD)?
In the United Kingdom, at 53.1334, -0.4721.
What kind of power plant is Metheringham Heath (Farm AD)?
It is a bioenergy power plant.
Is Metheringham Heath (Farm AD) still operating?
Yes. 6.5 MW is in operation.
Sources and identifiers
- GPPD IDGBR0000331
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.