- Operating capacity
- 32 MW
- Units
- 2
- Online since
- 2008
- Age
- 18 yrs
Marvila wind farm is a 32 MW wind power plant in Leiria, Portugal.
It has 2 units, which came online between 2008 and 2020. It is owned mainly by EKZ Renewables AG and operated by EKZ Renewables. By capacity it is the 48th largest of 234 operating wind plants in Portugal.
- Owner
- EKZ Renewables AG
EKZ Renewables AG [100%]
- Operator
- EKZ Renewables
- Coordinates
- 39.5701, -8.6888 (exact)
- GEM plant ID
- L100000909085
Plant details
How this wind plant is built and run.
- Installation
- Onshore
Timeline
When each unit started, retired, or is planned to retire.
- Operating
- Retired
- In development
- Until planned retirement
Units
2 units at this site.
| Unit | Capacity | Status | Start | Technology |
|---|---|---|---|---|
| 1.0 | 12 MW | Operating | 2008 | Onshore |
| 2.0 | 20 MW | Operating | 2020 | Onshore |
Electricity output
How much power this plant produces.
WRI Global Power Plant Database, 2013–2019.
- Latest annual output
- 29 GWh
- Capacity factor
- 10%
- Estimation method
- Wind model
Estimated · 2017
Output as a share of running at full power all year
Show data table
| Year | Reported (GWh) | Estimated (GWh) | Capacity factor | Method |
|---|---|---|---|---|
| 2013 | — | 32.57 | 12% | WIND-V1 |
| 2014 | — | 31.11 | 11% | WIND-V1 |
| 2015 | — | 26.55 | 9% | WIND-V1 |
| 2016 | — | 30.05 | 11% | WIND-V1 |
| 2017 | — | 29.43 | 10% | WIND-V1 |
| 2018 | — | — | — | — |
| 2019 | — | — | — | — |
How it compares
Size among operating wind plants.
- In Europe
- 1,892nd
- Age
- 18 yrs
of 7,126
Country average for wind: 18 yrs
1.2× the average wind plant in Portugal. About 11% of the size of the largest.
FAQ
About Marvila wind farm.
Who owns Marvila wind farm?
Its main owner is EKZ Renewables AG. It is operated by EKZ Renewables.
How big is Marvila wind farm?
It has 32 MW of operating capacity across 2 units. That makes it the 48th largest wind plant in Portugal and the 9,185th largest in the world.
Where is Marvila wind farm?
In Leiria, Portugal, at 39.5701, -8.6888.
When was Marvila wind farm built?
Its first unit started in 2008 and its newest in 2020.
How much electricity does Marvila wind farm generate?
An estimated 29 GWh was generated in 2017, a capacity factor of 10%, according to the WRI Global Power Plant Database.
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Wind Power Tracker (2026-02) · GEM Wiki page
- Output 2013–2019WRI Global Power Plant Database v1.3.0 · WRI1023386
- GEM plant IDL100000909085
- WEPP ID1074743
- World Resources Institute plant IDWRI1023386
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.