Global Power Plant Directory121,919 plants · 219 countries & territories

All plants / Brazil / Espírito Santo

Marataízes Private Installation solar project

SolarOperatingPV

Marataízes · Espírito Santo · Brazil

Operating capacity
2.5 MW
Units
1
Online since
2024
Age
2 yrs

Marataízes Private Installation solar project is a 2.5 MW solar power plant in Marataízes, Espírito Santo, Brazil.

It has been operating since 2024. By capacity it is the 575th largest of 2,766 operating solar plants in Brazil.

Owner
—
Coordinates
-21.0444, -40.8272 (approximate)
GEM plant ID
L100001048711

Plant details

How this solar plant is built and run.

Technology
PV

How it compares

Size among operating solar plants.

In Brazil
575th

of 2,766 solar plants · see all

In Americas
5,761st

of 11,032

In the world
38,007th

of 79,372 · largest solar plants

Age
2 yrs

Country average for solar: 3 yrs

This plantMarataízes Private Installation solar project
2.5 MW
Average solar plantIn Brazil, across 2,766 plants
9.1 MW
Largest in BrazilArinos Solar Complex
1.2 GW

27% of the average solar plant in Brazil. About 0% of the size of the largest.

FAQ

About Marataízes Private Installation solar project.

How big is Marataízes Private Installation solar project?

It has 2.5 MW of operating capacity. That makes it the 575th largest solar plant in Brazil and the 38,007th largest in the world.

Where is Marataízes Private Installation solar project?

In Marataízes, Espírito Santo, Brazil, at -21.0444, -40.8272.

When was Marataízes Private Installation solar project built?

It started operating in 2024.

What kind of power plant is Marataízes Private Installation solar project?

It is a solar power plant using PV technology.

Is Marataízes Private Installation solar project still operating?

Yes. 2.5 MW is in operation.

Sources and identifiers

  • Plant dataGlobal Energy Monitor, Global Solar Power Tracker (2026-02) · GEM Wiki page
  • GEM plant IDL100001048711
  • ANEEL unit IDGD.ES.002.717.796

Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.