All plants / Canada / Ontario
Loyalist Solar
Stone Mills · Lennox and Addington County · Eastern Ontario · Ontario · Canada
- Operating capacity
- 54 MW
- Units
- 1
- Online since
- 2019
- Age
- 7 yrs
Loyalist Solar is a 54 MW solar power plant in Stone Mills, Ontario, Canada.
It has been operating since 2019. It is owned mainly by Mohawks of the Bay of Quinte and operated by Bluearth Renewables. By capacity it is the 14th largest of 231 operating solar plants in Canada.
- Owner
- Mohawks of the Bay of Quinte
Mohawks of the Bay of Quinte; Bluearth Renewables Inc
- Operator
- Bluearth Renewables
- Coordinates
- 44.3423, -76.9765 (exact)
- GEM plant ID
- L100000804248
Plant details
How this solar plant is built and run.
- Technology
- PV
- Capacity rating
- MWac (grid-connection AC capacity)
Electricity output
How much power this plant produces.
WRI Global Power Plant Database, 2013–2019.
- Latest annual output
- 71 GWh
- Capacity factor
- 15%
- Estimation method
- Solar model
Estimated · 2017
Output as a share of running at full power all year
Show data table
| Year | Reported (GWh) | Estimated (GWh) | Capacity factor | Method |
|---|---|---|---|---|
| 2013 | — | 71.87 | 15% | SOLAR-V1-NO-AGE |
| 2014 | — | 78.80 | 17% | SOLAR-V1-NO-AGE |
| 2015 | — | 74.66 | 16% | SOLAR-V1-NO-AGE |
| 2016 | — | 77.74 | 16% | SOLAR-V1-NO-AGE |
| 2017 | — | 71.37 | 15% | SOLAR-V1-NO-AGE |
| 2018 | — | — | — | — |
| 2019 | — | — | — | — |
How it compares
Size among operating solar plants.
- In Americas
- 1,067th
- Age
- 7 yrs
of 11,032
Country average for solar: 9 yrs
3.0× the average solar plant in Canada. About 12% of the size of the largest.
FAQ
About Loyalist Solar.
Who owns Loyalist Solar?
Its main owner is Mohawks of the Bay of Quinte. It is operated by Bluearth Renewables.
How big is Loyalist Solar?
It has 54 MW of operating capacity. That makes it the 14th largest solar plant in Canada and the 4,885th largest in the world.
Where is Loyalist Solar?
In Stone Mills, Lennox and Addington County, Eastern Ontario, Ontario, Canada, at 44.3423, -76.9765.
When was Loyalist Solar built?
It started operating in 2019.
How much electricity does Loyalist Solar generate?
An estimated 71 GWh was generated in 2017, a capacity factor of 15%, according to the WRI Global Power Plant Database.
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Solar Power Tracker (2026-02) · GEM Wiki page
- Output 2013–2019WRI Global Power Plant Database v1.3.0 · WKS0067649
- GEM plant IDL100000804248
- World Resources Institute plant IDWKS0067649
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.