Global Power Plant Directory121,919 plants · 219 countries & territories

All plants / United States / Minnesota

Lady Slipper Solar Array CSG

SolarOperatingPV

Red Wing · Goodhue County · Minnesota · United States

Operating capacity
4.5 MW
Units
1
Online since
2019
Age
7 yrs

Lady Slipper Solar Array CSG is a 4.5 MW solar power plant in Red Wing, Minnesota, United States.

It has been operating since 2019. By capacity it is the 2,855th largest of 6,708 operating solar plants in the United States.

Owner
—
Operator
AEP OnSite Partners
Coordinates
44.5544, -92.6617 (exact)
GEM plant ID
L100000813698

Plant details

How this solar plant is built and run.

Technology
PV
Capacity rating
MWac (grid-connection AC capacity)

Electricity output

How much power this plant produces.

WRI Global Power Plant Database, 2013–2019.

ReportedEstimated
Latest annual output
5.9 GWh

Reported · 2019

Capacity factor
15%

Output as a share of running at full power all year

Reported by
U.S. Energy Information Administration
Show data table
YearReported (GWh)Estimated (GWh)Capacity factorMethod
2013 — — — NO-ESTIMATION
2014 — — — NO-ESTIMATION
2015 — — — NO-ESTIMATION
2016 — — — NO-ESTIMATION
2017 — 7.33 19% CAPACITY-FACTOR-V1
2018 — — — —
2019 5.92 — 15% —

How it compares

Size among operating solar plants.

In the United States
2,855th

of 6,708 solar plants · see all

In Americas
4,160th

of 11,032

In the world
27,404th

of 79,372 · largest solar plants

Age
7 yrs

Country average for solar: 7 yrs

This plantLady Slipper Solar Array CSG
4.5 MW
Average solar plantIn the United States, across 6,708 plants
23 MW
Largest in the United StatesEdwards Sanborn solar farm
957 MW

19% of the average solar plant in the United States. About 0% of the size of the largest.

FAQ

About Lady Slipper Solar Array CSG.

How big is Lady Slipper Solar Array CSG?

It has 4.5 MW of operating capacity. That makes it the 2,855th largest solar plant in the United States and the 27,404th largest in the world.

Where is Lady Slipper Solar Array CSG?

In Red Wing, Goodhue County, Minnesota, United States, at 44.5544, -92.6617.

When was Lady Slipper Solar Array CSG built?

It started operating in 2019.

How much electricity does Lady Slipper Solar Array CSG generate?

It reported 5.9 GWh in 2019, a capacity factor of 15%, according to the WRI Global Power Plant Database.

What kind of power plant is Lady Slipper Solar Array CSG?

It is a solar power plant using PV technology.

Sources and identifiers

  • Plant dataGlobal Energy Monitor, Global Solar Power Tracker (2026-02) · GEM Wiki page
  • Output 2013–2019WRI Global Power Plant Database v1.3.0 · USA0062414
  • GEM plant IDL100000813698
  • EIA plant ID62414

Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.