All plants / China / Xinjiang
Kuitun Jinjiang power station
锦江集团奎屯锦疆发电厂
Kuitun · Ili · Xinjiang · China
- Operating capacity
- 270 MW
- Units
- 2
- Online since
- 2008
- CO₂ a year
- 1.4 Mt
Kuitun Jinjiang power station is a 270 MW coal power plant in Kuitun, Xinjiang, China.
It has 2 units, online since 2008. Its boilers are subcritical. It is owned mainly by Kuitun Jinjiang Thermal Power Co Ltd. Traced to the top of the ownership chain, its largest owner is State-owned Assets Supervision and Administration Commission of the Seventh Division of Xinjiang Production and Construction Corps (31%). Global Energy Monitor estimates it emits about 1.4 million tonnes of CO₂ a year. By capacity it is the 918th largest of 1,225 operating coal plants in China.
- Owner
- Kuitun Jinjiang Thermal Power Co Ltd
Kuitun Jinjiang Thermal Power Co Ltd [100%]
- Parent company
- Xinjiang Production & Construction Corps Seventh Agricultural Division State-Own Ed Assets [34.4%]; Hangzhou Jinjiang Group Co Ltd [21.0%]; Xinjiang Production and Construction Corps Electric Power Group Co Ltd [13.4%]; Zhejiang Hengjia Holding Co Ltd [12.2%]; Hangzhou Yande Industrial Co Ltd [11.8%]; Zhejiang Kangrui Investment Co Ltd [5.0%]; unknown [2.2%]
- Coordinates
- 44.4051, 84.9298 (exact)
- GEM plant ID
- L100000101663
Plant details
How this coal plant is built and run.
- Combustion technology
- Subcritical
- Coal source
- Domestic
- Combined heat and power
- Yes
- Captive plant
- Supplies chemicals industry (power and heat)
- State ownership
- 48% · partial state-owned enterprise
Climate
Carbon dioxide from this plant, as estimated by Global Energy Monitor.
- CO₂ a year
- 1.41 Mt
- CO₂ over remaining life
- 24 Mt
- Capacity factor
- 52%
- Efficiency
- 30%
Million tonnes, operating units
Up to 17 more years of operation
Country average GEM assumes for its coal fleet, not this plant's own figure
From a heat rate of 11,313 Btu/kWh
Retirement and national pledges
- Planned retirement
- Not announced
- Coal phase-out pledge
- None recorded
- Net-zero target
- 2060in 34 years
No retirement date has been announced, so nothing yet ties the plant to China’s 2060 net-zero target. Pledges are national commitments recorded by Global Energy Monitor.
Timeline
When each unit started, retired, or is planned to retire.
- Operating
- Retired
- In development
- Until planned retirement
Who owns it
Direct owners, and the owners at the top of each chain, as a share of operating capacity.
Direct owners
- Kuitun Jinjiang Thermal Power Company100%
Ownership chain
- State-owned Assets Supervision and Administration Commission of the Seventh Division of Xinjiang Production and Construction Corps Governmentowns 90% of Xinjiang Production & Construction Corps Seventh Agricultural Division State-Own Ed Assets
- Xinjiang Production & Construction Corps Seventh Agricultural Division State-Own Ed Assets Companyowns 68.8% of Xinjiang Jinlong Electric Power Group
- Xinjiang Jinlong Electric Power Group Companyowns 50% of Kuitun Jinjiang Thermal Power
- Kuitun Jinjiang Thermal Power Companyowns 100% of this plant
Ultimately owned by
- natural person(s) Individuals50%
- State-owned Assets Supervision and Administration Commission of the Seventh Division of Xinjiang Production and Construction Corps Government31%
- State-owned Assets Supervision and Administration Commission of Xinjiang Production and Construction Corps Government16.8%
- Share not traceable2.2%
At least 47.8% traced to a government or state body.
See every plant owned by
Source: Global Energy Monitor, Global Energy Ownership Tracker, September 2026 (CC BY 4.0). Capacity is weighted by each owner’s share.
Units
2 units at this site.
| Unit | Capacity | Status | Start | Retired / planned | Technology | Coal | CO₂ a year |
|---|---|---|---|---|---|---|---|
| Unit 1 | 135 MW | Operating | 2008 | — | Subcritical | — | 0.71 Mt |
| Unit 2 | 135 MW | Operating | 2008 | — | Subcritical | — | 0.71 Mt |
How it compares
Size among operating coal plants.
- In Asia
- 1,301st
- Age
- 18 yrs
of 1,872
Country average for coal: 16 yrs
26% of the average coal plant in China. About 4% of the size of the largest.
FAQ
About Kuitun Jinjiang power station.
Who owns Kuitun Jinjiang power station?
Its main owner is Kuitun Jinjiang Thermal Power Co Ltd. Traced to the top of each ownership chain, its owners are State-owned Assets Supervision and Administration Commission of the Seventh Division of Xinjiang Production and Construction Corps (31%) and State-owned Assets Supervision and Administration Commission of Xinjiang Production and Construction Corps (17%).
How big is Kuitun Jinjiang power station?
It has 270 MW of operating capacity across 2 units. That makes it the 918th largest coal plant in China and the 1,691st largest in the world.
Where is Kuitun Jinjiang power station?
In Kuitun, Ili, Xinjiang, China, at 44.4051, 84.9298.
When was Kuitun Jinjiang power station built?
It started operating in 2008.
How much CO₂ does Kuitun Jinjiang power station emit?
Global Energy Monitor estimates about 1.4 million tonnes of CO₂ a year, and 24 million tonnes over the rest of its expected life.
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Coal Plant Tracker (2026-07) · GEM Wiki page
- OwnershipGlobal Energy Monitor, Global Energy Ownership Tracker, September 2026
- GEM plant IDL100000101663
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.