Global Power Plant Directory121,919 plants · 219 countries & territories

All plants / Russia / Leningrad

Kirishi GRES power station

Киришская ГРЭС

Gas OilOperatingSteam turbine, combined cycle

Kirishi · Leningrad · Russia

Operating capacity
2.5 GW
Units
13
Online since
1966
Age
60 yrs

Kirishi GRES power station is a 2.5 GW gas power plant in Kirishi, Leningrad, Russia.

It has 13 units, which came online between 1965 and 2024. It uses steam turbine technology burning natural gas, fossil liquids: heavy fuel oil. It is owned mainly by OGK-2 PJSC. Traced to the top of the ownership chain, its largest owner is Government of Russia (42%). By capacity it is the 7th largest of 340 operating gas plants in Russia.

Owner
OGK-2 PJSC

OGK-2 PJSC [100%]

Parent company
OGK-2 PJSC [100.0%]
In development
65 MW (from 2026)
Retired
110 MW (last in 2023)
Coordinates
59.4892, 32.0503 (exact)
GEM plant ID
L100000407226

Plant details

How this gas plant is built and run.

Technology
Steam turbine, combined cycle
Fuel
Fossil gas: natural gas, fossil liquids: heavy fuel oil
Fuel classification
Multi Fuel
Turbine or engine
Power Machines: PT-65/75-130/13-1, Power Machines: PT-60/70-130/7
Combined heat and power
Yes
Captive plant
Supplies oil & refining (heat)

Timeline

When each unit started, retired, or is planned to retire.

  • Operating
  • Retired
  • In development
  • Until planned retirement

Who owns it

Direct owners, and the owners at the top of each chain, as a share of operating capacity.

Direct owners

Ownership chain

  1. small shareholder(s) Unidentified ownersowns 50.7% of Gazprom
  2. Gazprom Companyowns 100% of Gazprom Energoholding
  3. Gazprom Energoholding Companyowns 99.6% of Centrenergoholding
  4. Centrenergoholding Companyowns 59.5% of OGK-2
  5. OGK-2 Companyowns 100% of this plant

Ultimately owned by

At least 41.6% traced to a government or state body.

Source: Global Energy Monitor, Global Energy Ownership Tracker, September 2026 (CC BY 4.0). Capacity is weighted by each owner’s share.

Units

13 units at this site.

UnitCapacityStatusStartRetired / plannedTechnologyTurbine or engine
CHP1 50 MW Retired 19652023Steam turbine—
CHP3 50 MW Operating 1966—Steam turbine—
CHP2 60 MW Retired 19672023Steam turbine—
CPP1 300 MW Operating 1969—Steam turbine—
CPP2 300 MW Operating 1970—Steam turbine—
CPP3 300 MW Operating 1970—Steam turbine—
CPP4 300 MW Operating 1971—Steam turbine—
CPP5 300 MW Operating 1973—Steam turbine—
CHP4 60 MW Operating 19752026 plannedSteam turbine—
CCGT-800 795 MW Operating 2012—Combined cycle—
CHP2R 65 MW Operating 2023—Steam turbine—
CHP1R 60 MW Operating 2024—Steam turbinePower Machines: PT-60/70-130/7
CHP4R 65 MW Under construction 2026—Steam turbinePower Machines: PT-65/75-130/13-1

Electricity output

How much power this plant produces.

WRI Global Power Plant Database, 2013–2019.

ReportedEstimated
Latest annual output
11.4 TWh

Estimated · 2017

Capacity factor
51%

Output as a share of running at full power all year

Estimation method
CAPACITY-FACTOR-V1
Show data table
YearReported (GWh)Estimated (GWh)Capacity factorMethod
2013 — — — NO-ESTIMATION
2014 — — — NO-ESTIMATION
2015 — — — NO-ESTIMATION
2016 — — — NO-ESTIMATION
2017 — 11,383.58 51% CAPACITY-FACTOR-V1
2018 — — — —
2019 — — — —

How it compares

Size among operating gas plants.

In Russia
7th

of 340 gas plants · see all

In Europe
7th

of 953

In the world
75th

of 5,616 · largest gas plants

Age
60 yrs

Country average for gas: 36 yrs

This plantKirishi GRES power station
2.5 GW
Average gas plantIn Russia, across 340 plants
380 MW
5.7 GW

6.7× the average gas plant in Russia. About 44% of the size of the largest.

FAQ

About Kirishi GRES power station.

Who owns Kirishi GRES power station?

Its main owner is OGK-2 PJSC. Traced to the top of each ownership chain, its owners are Government of Russia (42%).

How big is Kirishi GRES power station?

It has 2.5 GW of operating capacity across 13 units. That makes it the 7th largest gas plant in Russia and the 75th largest in the world.

Where is Kirishi GRES power station?

In Kirishi, Leningrad, Russia, at 59.4892, 32.0503.

When was Kirishi GRES power station built?

Its first unit started in 1965 and its newest in 2024.

How much electricity does Kirishi GRES power station generate?

An estimated 11.4 TWh was generated in 2017, a capacity factor of 51%, according to the WRI Global Power Plant Database.

Sources and identifiers

Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.