All plants / Greece / Western Macedonia
Kastoria Ayia Kyriaki solar project
Municipality of Kastoria · Kastoria Regional Unit · Western Macedonia · Greece
- Operating capacity
- 19 MW
- Units
- 1
- Online since
- 2017
- Age
- 9 yrs
Kastoria Ayia Kyriaki solar project is a 19 MW solar power plant in Municipality of Kastoria, Western Macedonia, Greece.
It has been operating since 2017. By capacity it is the 28th largest of 3,258 operating solar plants in Greece.
- Owner
- —
- Coordinates
- 40.5192, 21.1309 (exact)
- GEM plant ID
- L100001004736
Plant details
How this solar plant is built and run.
- Technology
- Assumed PV
- Capacity rating
- MWac (grid-connection AC capacity)
Electricity output
How much power this plant produces.
WRI Global Power Plant Database, 2013–2019.
- Latest annual output
- 10 GWh
- Capacity factor
- 6%
- Estimation method
- Solar model
Estimated · 2017
Output as a share of running at full power all year
Show data table
| Year | Reported (GWh) | Estimated (GWh) | Capacity factor | Method |
|---|---|---|---|---|
| 2013 | — | 9.41 | 6% | SOLAR-V1-NO-AGE |
| 2014 | — | 9.42 | 6% | SOLAR-V1-NO-AGE |
| 2015 | — | 9.84 | 6% | SOLAR-V1-NO-AGE |
| 2016 | — | 9.86 | 6% | SOLAR-V1-NO-AGE |
| 2017 | — | 10.15 | 6% | SOLAR-V1-NO-AGE |
| 2018 | — | — | — | — |
| 2019 | — | — | — | — |
How it compares
Size among operating solar plants.
- In Europe
- 1,284th
- Age
- 9 yrs
of 28,467
Country average for solar: 3 yrs
11× the average solar plant in Greece. About 10% of the size of the largest.
FAQ
About Kastoria Ayia Kyriaki solar project.
How big is Kastoria Ayia Kyriaki solar project?
It has 19 MW of operating capacity. That makes it the 28th largest solar plant in Greece and the 10,539th largest in the world.
Where is Kastoria Ayia Kyriaki solar project?
In Municipality of Kastoria, Kastoria Regional Unit, Western Macedonia, Greece, at 40.5192, 21.1309.
When was Kastoria Ayia Kyriaki solar project built?
It started operating in 2017.
How much electricity does Kastoria Ayia Kyriaki solar project generate?
An estimated 10 GWh was generated in 2017, a capacity factor of 6%, according to the WRI Global Power Plant Database.
What kind of power plant is Kastoria Ayia Kyriaki solar project?
It is a solar power plant using Assumed PV technology.
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Solar Power Tracker (2026-02) · GEM Wiki page
- Output 2013–2019WRI Global Power Plant Database v1.3.0 · WKS0071380
- GEM plant IDL100001004736
- Dunnett unit ID14459
- Dunnett unit ID14762
- GVP unit ID11921
- GVP unit ID12061
- GVP unit ID12100
- GVP unit ID12278
- GVP unit ID12399
- GVP unit ID12429
- GVP unit ID38517
- GVP unit ID38614
- GVP unit ID38632
- GVP unit ID38664
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.