Global Power Plant Directory121,919 plants · 219 countries & territories

All plants / United States / California

Judge Francis Carr hydroelectric plant

HydroOperatingConventional storage

French Gulch · Shasta County · California · United States

Operating capacity
154 MW
Units
1
Online since
1963
Age
63 yrs

Judge Francis Carr hydroelectric plant is a 154 MW hydropower plant in French Gulch, California, United States.

It has been operating since 1963. It is a conventional storage plant on the Trinity River. It is owned mainly by US Bureau of Reclamation. By capacity it is the 132nd largest of 1,436 operating hydropower plants in the United States.

Owner
US Bureau of Reclamation

US Bureau of Reclamation [100%]

Operator
US Bureau of Reclamation
Coordinates
40.6469, -122.6270 (exact)
GEM plant ID
L100000603838

Plant details

How this hydropower plant is built and run.

Type
Conventional storage
River
Trinity River
Turbines
2 x 77.2 MW

Electricity output

How much power this plant produces.

WRI Global Power Plant Database, 2013–2019.

ReportedEstimated
Latest annual output
263 GWh

Reported · 2019

Capacity factor
20%

Output as a share of running at full power all year

Reported by
U.S. Energy Information Administration
Show data table
YearReported (GWh)Estimated (GWh)Capacity factorMethod
2013 423.71 292.23 31% HYDRO-V1
2014 338.34 333.90 25% HYDRO-V1
2015 248.67 258.36 18% HYDRO-V1
2016 133.55 404.69 10% HYDRO-V1
2017 359.69 312.47 27% HYDRO-V1
2018 209.39 — 16% —
2019 263.35 — 20% —

How it compares

Size among operating hydropower plants.

In the United States
132nd

of 1,436 hydropower plants · see all

In the world
1,655th

of 9,108 · largest hydropower plants

Age
63 yrs

Country average for hydropower: 71 yrs

This plantJudge Francis Carr hydroelectric plant
154 MW
Average hydropower plantIn the United States, across 1,436 plants
71 MW
Largest in the United StatesNathaniel Washington hydroelectric plant
4.2 GW

2.2× the average hydropower plant in the United States. About 4% of the size of the largest.

FAQ

About Judge Francis Carr hydroelectric plant.

Who owns Judge Francis Carr hydroelectric plant?

Its main owner is US Bureau of Reclamation.

How big is Judge Francis Carr hydroelectric plant?

It has 154 MW of operating capacity. That makes it the 132nd largest hydropower plant in the United States and the 1,655th largest in the world.

Where is Judge Francis Carr hydroelectric plant?

In French Gulch, Shasta County, California, United States, at 40.6469, -122.6270.

When was Judge Francis Carr hydroelectric plant built?

It started operating in 1963.

Which river is Judge Francis Carr hydroelectric plant on?

The Trinity River.

Sources and identifiers

  • Plant dataGlobal Energy Monitor, Global Hydropower Tracker (2026-03) · GEM Wiki page
  • Output 2013–2019WRI Global Power Plant Database v1.3.0 · USA0000442
  • GEM plant IDL100000603838
  • WEPP ID35648

Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.