Global Power Plant Directory121,919 plants · 219 countries & territories

All plants / Portugal

Joguinho wind farm

WindOperatingOnshore

Maxial e Monte Redondo · Lisbon · Portugal

Operating capacity
26 MW
Units
1
Online since
2006
Age
20 yrs

Joguinho wind farm is a 26 MW wind power plant in Maxial e Monte Redondo, Lisbon, Portugal.

It has been operating since 2006. It is owned mainly by EDP Renováveis and operated by Viesgo Renovables. By capacity it is the 59th largest of 234 operating wind plants in Portugal.

Owner
EDP Renováveis

EDP Renováveis [100%]

Operator
Viesgo Renovables
Coordinates
39.1101, -9.1601 (exact)
GEM plant ID
L100000912791

Plant details

How this wind plant is built and run.

Installation
Onshore

Electricity output

How much power this plant produces.

WRI Global Power Plant Database, 2013–2019.

ReportedEstimated
Latest annual output
58 GWh

Estimated · 2017

Capacity factor
26%

Output as a share of running at full power all year

Estimation method
Wind model
Show data table
YearReported (GWh)Estimated (GWh)Capacity factorMethod
2013 — 76.08 33% WIND-V1
2014 — 61.46 27% WIND-V1
2015 — 64.24 28% WIND-V1
2016 — 65.52 29% WIND-V1
2017 — 58.14 26% WIND-V1
2018 — — — —
2019 — — — —

How it compares

Size among operating wind plants.

In Portugal
59th

of 234 wind plants · see all

In Europe
2,454th

of 7,126

In the world
10,274th

of 17,121 · largest wind plants

Age
20 yrs

Country average for wind: 18 yrs

This plantJoguinho wind farm
26 MW
Average wind plantIn Portugal, across 234 plants
26 MW
Largest in PortugalVentominho wind farm
293 MW

About average for Portugal. About 9% of the size of the largest.

FAQ

About Joguinho wind farm.

Who owns Joguinho wind farm?

Its main owner is EDP Renováveis. It is operated by Viesgo Renovables.

How big is Joguinho wind farm?

It has 26 MW of operating capacity. That makes it the 59th largest wind plant in Portugal and the 10,274th largest in the world.

Where is Joguinho wind farm?

In Maxial e Monte Redondo, Lisbon, Portugal, at 39.1101, -9.1601.

When was Joguinho wind farm built?

It started operating in 2006.

How much electricity does Joguinho wind farm generate?

An estimated 58 GWh was generated in 2017, a capacity factor of 26%, according to the WRI Global Power Plant Database.

Sources and identifiers

  • Plant dataGlobal Energy Monitor, Global Wind Power Tracker (2026-02) · GEM Wiki page
  • Output 2013–2019WRI Global Power Plant Database v1.3.0 · WRI1023360
  • GEM plant IDL100000912791
  • WEPP ID1068891
  • World Resources Institute plant IDWRI1023360

Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.