All plants / China / Jilin
Jilin cogen power station
国电吉林热电厂
35 Xvzhou Road · Longtan · Jilin · China
- Operating capacity
- 690 MW
- Units
- 15
- Online since
- 1988
- CO₂ a year
- 4.0 Mt
Jilin cogen power station is a 690 MW coal power plant in 35 Xvzhou Road, Jilin, China.
It has 15 units, which came online between 1959 and 2001. Its boilers are subcritical. It is owned mainly by Guoneng Jilin Longhua Thermal Power Co Ltd Jilin Thermal Power Plant. Traced to the top of the ownership chain, its largest owner is China Energy Investment (83%). Global Energy Monitor estimates it emits about 4.0 million tonnes of CO₂ a year. By capacity it is the 649th largest of 1,225 operating coal plants in China. Its last operating unit is due to retire in 2024.
- Owner
- Guoneng Jilin Longhua Thermal Power Co Ltd Jilin Thermal Power Plant
Guoneng Jilin Longhua Thermal Power Co Ltd Jilin Thermal Power Plant [100%]
- Parent company
- China Energy Investment Corp [82.9%]; Jilin Mingmen Electric Power Industry Group Co [9.0%]; Guodian Jilin Longhua Thermoelectricity Co Ltd [7.7%]; unknown [0.4%]
- In development
- 700 MW (from 2026)
- Retired
- 435 MW (last in 2013)
- Coordinates
- 43.8996, 126.5701 (exact)
- GEM plant ID
- L100000101094
Plant details
How this coal plant is built and run.
- Combustion technology
- Subcritical, supercritical
- Coal source
- Domestic
- Combined heat and power
- Yes
- Permit
- March 28, 2024
Climate
Carbon dioxide from this plant, as estimated by Global Energy Monitor.
- CO₂ a year
- 3.97 Mt
- CO₂ over remaining life
- 20 Mt
- Capacity factor
- 52%
- Efficiency
- 27%
- If new units are built
- 105 Mt
Million tonnes, operating units
Up to 5 more years of operation
Country average GEM assumes for its coal fleet, not this plant's own figure
From a heat rate of 12,460 Btu/kWh
Lifetime CO₂ of units in development
Retirement and national pledges
- Planned retirement
- 20242 years ago
- Coal phase-out pledge
- None recorded
- Net-zero target
- 2060in 34 years
The planned retirement comes before the country’s net-zero target. Pledges are national commitments recorded by Global Energy Monitor.
Timeline
When each unit started, retired, or is planned to retire.
- Operating
- Retired
- In development
- Until planned retirement
Who owns it
Direct owners, and the owners at the top of each chain, as a share of operating capacity.
Direct owners
Ownership chain
- China Energy Investment Companyowns 100% of Guodian Northeast Electric Power
- Guodian Northeast Electric Power Companyowns 82.9% of Guodian Jilin Longhua Thermoelectricity
- Guodian Jilin Longhua Thermoelectricity Companyowns 100% of Guoneng Jilin Longhua Thermal Power Co Ltd Jilin Thermal Power Plant
- Guoneng Jilin Longhua Thermal Power Co Ltd Jilin Thermal Power Plant Companyowns 100% of this plant
Ultimately owned by
- China Energy Investment Company82.9%
- Jilin Mingmen Electric Power Industry Group Company9%
- natural person(s) Individuals7.7%
No share traced to a government or state body.
See every plant owned by
Source: Global Energy Monitor, Global Energy Ownership Tracker, September 2026 (CC BY 4.0). Capacity is weighted by each owner’s share.
Units
15 units at this site.
| Unit | Capacity | Status | Start | Retired / planned | Technology | Coal | CO₂ a year |
|---|---|---|---|---|---|---|---|
| Unit 7 | 65 MW | Retired | 1959 | 2013 | Subcritical | — | — |
| Unit A | 50 MW | Retired | 1960 | 2013 | Subcritical | — | — |
| Unit B | 50 MW | Retired | 1960 | 2013 | Subcritical | — | — |
| Unit 10 | 220 MW | Operating | 1988 | 2024 planned | Subcritical | — | 1.28 Mt |
| Unit 11 | 220 MW | Operating | 1989 | 2024 planned | Subcritical | — | 1.28 Mt |
| Unit 8 | 125 MW | Operating | 2000 | 2024 planned | Subcritical | — | 0.70 Mt |
| Unit 9 | 125 MW | Operating | 2001 | 2024 planned | Subcritical | — | 0.70 Mt |
| Unit 12 | 350 MW | Under construction | 2026 | — | Supercritical | — | — |
| Unit 13 | 350 MW | Under construction | 2026 | — | Supercritical | — | — |
| Unit 1 | 35 MW | Retired | — | 2011 | Subcritical | — | — |
| Unit 2 | 35 MW | Retired | — | 2011 | Subcritical | — | — |
| Unit 3 | 35 MW | Retired | — | 2011 | Subcritical | — | — |
| Unit 4 | 35 MW | Retired | — | 2011 | Subcritical | — | — |
| Unit 5 | 65 MW | Retired | — | 2011 | Subcritical | — | — |
| Unit 6 | 65 MW | Retired | — | 2011 | Subcritical | — | — |
How it compares
Size among operating coal plants.
- In Asia
- 896th
- Age
- 38 yrs
of 1,872
Country average for coal: 16 yrs
66% of the average coal plant in China. About 10% of the size of the largest.
FAQ
About Jilin cogen power station.
Who owns Jilin cogen power station?
Its main owner is Guoneng Jilin Longhua Thermal Power Co Ltd Jilin Thermal Power Plant. Traced to the top of each ownership chain, its owners are China Energy Investment (83%) and Jilin Mingmen Electric Power Industry Group (9%).
How big is Jilin cogen power station?
It has 690 MW of operating capacity across 15 units. That makes it the 649th largest coal plant in China and the 1,110th largest in the world.
Where is Jilin cogen power station?
In 35 Xvzhou Road, Longtan, Jilin, China, at 43.8996, 126.5701.
When was Jilin cogen power station built?
Its first unit started in 1959 and its newest in 2001.
How much CO₂ does Jilin cogen power station emit?
Global Energy Monitor estimates about 4.0 million tonnes of CO₂ a year, and 20 million tonnes over the rest of its expected life.
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Coal Plant Tracker (2026-07) · GEM Wiki page
- OwnershipGlobal Energy Monitor, Global Energy Ownership Tracker, September 2026
- GEM plant IDL100000101094