All plants / China / Jiangsu
Jiangsu Lianyungang power station
连云港市晨兴环保垃圾焚烧电厂
Lianyun District · Lianyungang · Jiangsu · China
- Operating capacity
- 53 MW
- Units
- 3
- Online since
- 2010
- Age
- 16 yrs
Jiangsu Lianyungang power station is a 53 MW waste-to-energy plant in Lianyun District, Jiangsu, China.
It has 3 units, which came online between 2010 and 2021. It is owned mainly by Hangzhou Jinhuan Investment Co Ltd and operated by Lianyungang Morningside Environmental Protection Industry. Traced to the top of the ownership chain, its largest owner is Gevin (100%). By capacity it is the 95th largest of 764 operating waste-to-energy plants in China.
- Owner
- Hangzhou Jinhuan Investment Co Ltd
Hangzhou Jinhuan Investment Co Ltd [100%]
- Parent company
- Gevin Ltd [100.0%]
- Operator
- Lianyungang Morningside Environmental Protection Industry
- Coordinates
- 34.6871, 119.1999 (exact)
- GEM plant ID
- L100000201552
Plant details
How this waste-to-energy plant is built and run.
- Fuel
- Refuse (municipal and industrial wastes)
Timeline
When each unit started, retired, or is planned to retire.
- Operating
- Retired
- In development
- Until planned retirement
Who owns it
Direct owners, and the owners at the top of each chain, as a share of operating capacity.
Direct owners
- Hangzhou Jinhuan Investment Company100%
Ownership chain
- Gevin Companyowns 100% of Hangzhou Jinhuan Investment
- Hangzhou Jinhuan Investment Companyowns 100% of this plant
See every plant owned by
Source: Global Energy Monitor, Global Energy Ownership Tracker, September 2026 (CC BY 4.0). Capacity is weighted by each owner’s share.
Units
3 units at this site.
| Unit | Capacity | Status | Start | Retired / planned | Technology |
|---|---|---|---|---|---|
| 46023.0 | 12 MW | Operating | 2010 | — | — |
| 46024.0 | 6.0 MW | Operating | 2010 | — | — |
| 2.0 | 35 MW | Operating | 2021 | — | — |
How it compares
Size among operating waste-to-energy plants.
- In Asia
- 106th
- Age
- 16 yrs
of 874
Country average for waste-to-energy: 7 yrs
1.8× the average waste-to-energy plant in China. About 19% of the size of the largest.
FAQ
About Jiangsu Lianyungang power station.
Who owns Jiangsu Lianyungang power station?
Its main owner is Hangzhou Jinhuan Investment Co Ltd. Traced to the top of each ownership chain, its owners are Gevin (100%). It is operated by Lianyungang Morningside Environmental Protection Industry.
How big is Jiangsu Lianyungang power station?
It has 53 MW of operating capacity across 3 units. That makes it the 95th largest waste-to-energy plant in China and the 169th largest in the world.
Where is Jiangsu Lianyungang power station?
In Lianyun District, Lianyungang, Jiangsu, China, at 34.6871, 119.1999.
When was Jiangsu Lianyungang power station built?
Its first unit started in 2010 and its newest in 2021.
What kind of power plant is Jiangsu Lianyungang power station?
It is a waste-to-energy plant, fuelled by refuse (municipal and industrial wastes).
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Bioenergy Power Tracker (2026-10) · GEM Wiki page
- OwnershipGlobal Energy Monitor, Global Energy Ownership Tracker, September 2026
- GEM plant IDL100000201552
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.