Global Power Plant Directory121,919 plants · 219 countries & territories

All plants / Spain / Andalucía

Huéneja wind farm

WindOperatingOnshore

Comarca de Guadix · Granada · Andalucía · Spain

Operating capacity
50 MW
Units
1
Online since
2006
Age
20 yrs

Huéneja wind farm is a 50 MW wind power plant in Comarca de Guadix, Andalucía, Spain.

It has been operating since 2006. It is owned mainly by Iberdrola Renovables Energia SA and operated by Iberdrola Renovables Andalucía. By capacity it is the 85th largest of 939 operating wind plants in Spain.

Owner
Iberdrola Renovables Energia SA

Iberdrola Renovables Energia SA [100%]

Operator
Iberdrola Renovables Andalucía
Coordinates
37.1766, -2.9502 (exact)
GEM plant ID
L100000914949

Plant details

How this wind plant is built and run.

Installation
Onshore

Electricity output

How much power this plant produces.

WRI Global Power Plant Database, 2013–2019.

ReportedEstimated
Latest annual output
128 GWh

Estimated · 2017

Capacity factor
29%

Output as a share of running at full power all year

Estimation method
Wind model
Show data table
YearReported (GWh)Estimated (GWh)Capacity factorMethod
2013 — 134.47 31% WIND-V1
2014 — 125.56 29% WIND-V1
2015 — 122.52 28% WIND-V1
2016 — 129.81 30% WIND-V1
2017 — 127.51 29% WIND-V1
2018 — — — —
2019 — — — —

How it compares

Size among operating wind plants.

In Spain
85th

of 939 wind plants · see all

In Europe
831st

of 7,126

In the world
5,199th

of 17,121 · largest wind plants

Age
20 yrs

Country average for wind: 18 yrs

This plantHuéneja wind farm
50 MW
Average wind plantIn Spain, across 939 plants
36 MW
Largest in SpainLas Majas wind farm
465 MW

1.4× the average wind plant in Spain. About 11% of the size of the largest.

FAQ

About Huéneja wind farm.

Who owns Huéneja wind farm?

Its main owner is Iberdrola Renovables Energia SA. It is operated by Iberdrola Renovables Andalucía.

How big is Huéneja wind farm?

It has 50 MW of operating capacity. That makes it the 85th largest wind plant in Spain and the 5,199th largest in the world.

Where is Huéneja wind farm?

In Comarca de Guadix, Granada, Andalucía, Spain, at 37.1766, -2.9502.

When was Huéneja wind farm built?

It started operating in 2006.

How much electricity does Huéneja wind farm generate?

An estimated 128 GWh was generated in 2017, a capacity factor of 29%, according to the WRI Global Power Plant Database.

Sources and identifiers

  • Plant dataGlobal Energy Monitor, Global Wind Power Tracker (2026-02) · GEM Wiki page
  • Output 2013–2019WRI Global Power Plant Database v1.3.0 · WRI1007279
  • GEM plant IDL100000914949
  • WEPP ID1079538
  • World Resources Institute plant IDWRI1007279

Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.