All plants / China / Hebei
Hebei Baoding (CECEP) power station
保定市垃圾焚烧发电项目
Suncun · Qingyuan District · Baoding · Hebei · China
- Operating capacity
- 49 MW
- Units
- 3
- Online since
- 2014
- Age
- 12 yrs
Hebei Baoding (CECEP) power station is a 49 MW waste-to-energy plant in Suncun, Hebei, China.
It has 3 units, which came online between 2014 and 2020. It is owned mainly by China National Environmental Protection Group and operated by CECEP (Baoding) Environmental Protection Energy. Traced to the top of the ownership chain, its largest owner is China Energy Conservation and Environmental Protection Group (100%). By capacity it is the 114th largest of 764 operating waste-to-energy plants in China.
- Owner
- China National Environmental Protection Group
China National Environmental Protection Group [100%]
- Parent company
- China Energy Conservation and Environmental Protection Group Co Ltd [100.0%]
- Operator
- CECEP (Baoding) Environmental Protection Energy
- Coordinates
- 38.8329, 115.6247 (exact)
- GEM plant ID
- L100001047092
Plant details
How this waste-to-energy plant is built and run.
- Fuel
- Refuse (municipal and industrial wastes)
Timeline
When each unit started, retired, or is planned to retire.
- Operating
- Retired
- In development
- Until planned retirement
Who owns it
Direct owners, and the owners at the top of each chain, as a share of operating capacity.
Direct owners
- China National Environmental Protection Group Company100%
Ownership chain
- China Energy Conservation and Environmental Protection Group Companyowns 100% of China National Environmental Protection Group
- China National Environmental Protection Group Companyowns 100% of this plant
Ultimately owned by
No share traced to a government or state body.
See every plant owned by
Source: Global Energy Monitor, Global Energy Ownership Tracker, September 2026 (CC BY 4.0). Capacity is weighted by each owner’s share.
Units
3 units at this site.
| Unit | Capacity | Status | Start | Retired / planned | Technology |
|---|---|---|---|---|---|
| 46023.0 | 12 MW | Operating | 2014 | — | — |
| 46024.0 | 12 MW | Operating | 2014 | — | — |
| 2.0 | 25 MW | Operating | 2020 | — | — |
How it compares
Size among operating waste-to-energy plants.
- In Asia
- 130th
- Age
- 12 yrs
of 874
Country average for waste-to-energy: 7 yrs
1.7× the average waste-to-energy plant in China. About 18% of the size of the largest.
FAQ
About Hebei Baoding (CECEP) power station.
Who owns Hebei Baoding (CECEP) power station?
Its main owner is China National Environmental Protection Group. Traced to the top of each ownership chain, its owners are China Energy Conservation and Environmental Protection Group (100%). It is operated by CECEP (Baoding) Environmental Protection Energy.
How big is Hebei Baoding (CECEP) power station?
It has 49 MW of operating capacity across 3 units. That makes it the 114th largest waste-to-energy plant in China and the 205th largest in the world.
Where is Hebei Baoding (CECEP) power station?
In Suncun, Qingyuan District, Baoding, Hebei, China, at 38.8329, 115.6247.
When was Hebei Baoding (CECEP) power station built?
Its first unit started in 2014 and its newest in 2020.
What kind of power plant is Hebei Baoding (CECEP) power station?
It is a waste-to-energy plant, fuelled by refuse (municipal and industrial wastes).
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Bioenergy Power Tracker (2026-10) · GEM Wiki page
- OwnershipGlobal Energy Monitor, Global Energy Ownership Tracker, September 2026
- GEM plant IDL100001047092
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.