All plants / United Arab Emirates / Dubai
Hassyan Clean-Coal Power Project
محطة حصيان لإنتاج الطاقة
Jebel Ali · Dubai · United Arab Emirates
- Operating capacity
- 2.4 GW
- Units
- 10
- Online since
- 2022
- Age
- 4 yrs
Hassyan Clean-Coal Power Project is a 2.4 GW gas power plant in Jebel Ali, Dubai, United Arab Emirates.
It has 10 units, which came online between 2020 and 2023. Its boilers are ultra-supercritical. It is owned mainly by Hassyan Energy Phase I PSC and operated by Hassyan Energy Phase I. Traced to the top of the ownership chain, its largest owner is Municipality of Dubai (42%). By capacity it is the 6th largest of 34 operating gas plants in the United Arab Emirates.
- Owner
- Hassyan Energy Phase I PSC
Hassyan Energy Phase I PSC [100%]
- Parent company
- Dubai Electricity and Water Authority PJSC [51.0%]; ACWA Power Co [27.0%]; Harbin Electric Co Ltd [14.7%]; The Silk Road Fund Co Ltd [7.4%]
- Operator
- Hassyan Energy Phase I
- Retired
- 1.2 GW (last in 2022)
- Coordinates
- 24.9115, 54.9155 (exact)
- GEM plant ID
- L100000103749
Plant details
How this gas plant is built and run.
- Combustion technology
- Ultra-supercritical
- Coal source
- Imported
- Coal supply notes
- imported
- Combined heat and power
- No
- Planned conversion
- To fossil gas: natural gas
- State ownership
- 54% · partial state-owned enterprise
Timeline
When each unit started, retired, or is planned to retire.
- Operating
- Retired
- In development
- Until planned retirement
Who owns it
Direct owners, and the owners at the top of each chain, as a share of operating capacity.
Direct owners
- Hassyan Energy Phase I Company100%
Ownership chain
- Municipality of Dubai Governmentowns 82% of Dubai Electricity and Water Authority
- Dubai Electricity and Water Authority Companyowns 51% of Hassyan Energy Phase I
- Hassyan Energy Phase I Companyowns 100% of this plant
Ultimately owned by
- Municipality of Dubai Government41.8%
- Government of Saudi Arabia Government11.9%
- Share not traceable9.2%
- small shareholder(s) Unidentified owners8.9%
- Harbin Electric Company8.9%
- natural person(s) Individuals6.2%
- Shareholders of overseas listed foreign shares Company5.8%
- State Administration Of Foreign Exchange State body4.8%
- The Export-Import Bank of China Company1.1%
- China Investment Company1.1%
- China Development Bank Company0.4%
At least 58.6% traced to a government or state body.
See every plant owned by
Source: Global Energy Monitor, Global Energy Ownership Tracker, September 2026 (CC BY 4.0). Capacity is weighted by each owner’s share.
Units
10 units at this site.
| Unit | Capacity | Status | Start | Retired / planned | Technology | Coal | CO₂ a year |
|---|---|---|---|---|---|---|---|
| Unit 1, timepoint 1 | 600 MW | Retired | 2020 | 2022 | Ultra-supercritical | — | — |
| Unit 2, timepoint 1 | 600 MW | Retired | 2021 | 2022 | Ultra-supercritical | — | — |
| Unit 1, timepoint 2 | 600 MW | Operating | 2022 | — | Steam turbine | Fossil gas: natural gas | — |
| Unit 2, timepoint 2 | 600 MW | Operating | 2022 | — | Steam turbine | Fossil gas: natural gas | — |
| Unit 3 (gas) | 600 MW | Operating | 2023 | — | Steam turbine | Fossil gas: natural gas | — |
| Unit 4 (gas) | 600 MW | Operating | 2023 | — | Steam turbine | Fossil gas: natural gas | — |
| Unit 3 | 600 MW | Cancelled | — | — | Ultra-supercritical | — | — |
| Unit 4 | 600 MW | Cancelled | — | — | Ultra-supercritical | — | — |
| Unit 5 | 600 MW | Cancelled | — | — | Ultra-supercritical | — | — |
| Unit 6 | 600 MW | Cancelled | — | — | Ultra-supercritical | — | — |
How it compares
Size among operating gas plants.
- In Asia
- 64th
- Age
- 4 yrs
of 1,355
Country average for gas: 21 yrs
1.7× the average gas plant in the United Arab Emirates. About 64% of the size of the largest.
FAQ
About Hassyan Clean-Coal Power Project.
Who owns Hassyan Clean-Coal Power Project?
Its main owner is Hassyan Energy Phase I PSC. Traced to the top of each ownership chain, its owners are Municipality of Dubai (42%), Government of Saudi Arabia (12%), Harbin Electric (9%) and Shareholders of overseas listed foreign shares (6%). It is operated by Hassyan Energy Phase I.
How big is Hassyan Clean-Coal Power Project?
It has 2.4 GW of operating capacity across 10 units. That makes it the 6th largest gas plant in the United Arab Emirates and the 95th largest in the world.
Where is Hassyan Clean-Coal Power Project?
In Jebel Ali, Dubai, United Arab Emirates, at 24.9115, 54.9155.
When was Hassyan Clean-Coal Power Project built?
Its first unit started in 2020 and its newest in 2023.
What kind of power plant is Hassyan Clean-Coal Power Project?
It is a gas power plant using ultra-supercritical technology. It can also run on coal.
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Coal Plant Tracker (2026-07) · GEM Wiki page
- OwnershipGlobal Energy Monitor, Global Energy Ownership Tracker, September 2026
- GEM plant IDL100000103749
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.