Global Power Plant Directory121,919 plants · 219 countries & territories

All plants / United States / New York

Greenville CSG solar farm

SolarOperatingPV

Port Jervis · Orange County · New York · United States

Operating capacity
2.0 MW
Units
1
Online since
2019
Age
7 yrs

Greenville CSG solar farm is a 2.0 MW solar power plant in Port Jervis, New York, United States.

It has been operating since 2019. By capacity it is the 4,144th largest of 6,708 operating solar plants in the United States.

Owner
—
Operator
Altus Power America Management
Coordinates
41.3560, -74.6220 (exact)
GEM plant ID
L100000813240

Plant details

How this solar plant is built and run.

Technology
PV
Capacity rating
MWac (grid-connection AC capacity)

Electricity output

How much power this plant produces.

WRI Global Power Plant Database, 2013–2019.

ReportedEstimated
Latest annual output
0.7 GWh

Reported · 2019

Capacity factor
4%

Output as a share of running at full power all year

Reported by
U.S. Energy Information Administration
Show data table
YearReported (GWh)Estimated (GWh)Capacity factorMethod
2013 — — — NO-ESTIMATION
2014 — — — NO-ESTIMATION
2015 — — — NO-ESTIMATION
2016 — — — NO-ESTIMATION
2017 — 3.25 19% CAPACITY-FACTOR-V1
2018 — — — —
2019 0.74 — 4% —

How it compares

Size among operating solar plants.

In the United States
4,144th

of 6,708 solar plants · see all

In Americas
6,600th

of 11,032

In the world
42,580th

of 79,372 · largest solar plants

Age
7 yrs

Country average for solar: 7 yrs

This plantGreenville CSG solar farm
2.0 MW
Average solar plantIn the United States, across 6,708 plants
23 MW
Largest in the United StatesEdwards Sanborn solar farm
957 MW

9% of the average solar plant in the United States. About 0% of the size of the largest.

FAQ

About Greenville CSG solar farm.

How big is Greenville CSG solar farm?

It has 2.0 MW of operating capacity. That makes it the 4,144th largest solar plant in the United States and the 42,580th largest in the world.

Where is Greenville CSG solar farm?

In Port Jervis, Orange County, New York, United States, at 41.3560, -74.6220.

When was Greenville CSG solar farm built?

It started operating in 2019.

How much electricity does Greenville CSG solar farm generate?

It reported 0.7 GWh in 2019, a capacity factor of 4%, according to the WRI Global Power Plant Database.

What kind of power plant is Greenville CSG solar farm?

It is a solar power plant using PV technology.

Sources and identifiers

  • Plant dataGlobal Energy Monitor, Global Solar Power Tracker (2026-02) · GEM Wiki page
  • Output 2013–2019WRI Global Power Plant Database v1.3.0 · USA0062759
  • GEM plant IDL100000813240
  • EIA plant ID62759

Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.