All plants / United States / Minnesota
GRE Marshan Solar
Hastings · Dakota County · Minnesota · United States
- Operating capacity
- 1.0 MW
- Units
- 1
- Online since
- 2017
- Age
- 9 yrs
GRE Marshan Solar is a 1.0 MW solar power plant in Hastings, Minnesota, United States.
It has been operating since 2017. It is owned mainly by SoCore 2016 ProjectCo-W1 LLC and operated by SoCore Energy. By capacity it is the 5,895th largest of 6,708 operating solar plants in the United States.
- Owner
- SoCore 2016 ProjectCo-W1 LLC
SoCore 2016 ProjectCo-W1 LLC [100%]
- Operator
- SoCore Energy
- Coordinates
- 44.6922, -92.8169 (exact)
- GEM plant ID
- L100000813221
Plant details
How this solar plant is built and run.
- Technology
- PV
- Capacity rating
- MWac (grid-connection AC capacity)
Electricity output
How much power this plant produces.
WRI Global Power Plant Database, 2013–2019.
- Latest annual output
- 1.3 GWh
- Capacity factor
- 15%
- Reported by
- U.S. Energy Information Administration
Reported · 2019
Output as a share of running at full power all year
Show data table
| Year | Reported (GWh) | Estimated (GWh) | Capacity factor | Method |
|---|---|---|---|---|
| 2013 | — | — | — | NO-ESTIMATION |
| 2014 | — | — | — | NO-ESTIMATION |
| 2015 | — | — | — | NO-ESTIMATION |
| 2016 | — | — | — | NO-ESTIMATION |
| 2017 | 0.13 | 1.62 | 2% | CAPACITY-FACTOR-V1 |
| 2018 | 1.43 | — | 16% | — |
| 2019 | 1.33 | — | 15% | — |
How it compares
Size among operating solar plants.
- In Americas
- 9,006th
- Age
- 9 yrs
of 11,032
Country average for solar: 7 yrs
4% of the average solar plant in the United States. About 0% of the size of the largest.
FAQ
About GRE Marshan Solar.
Who owns GRE Marshan Solar?
Its main owner is SoCore 2016 ProjectCo-W1 LLC. It is operated by SoCore Energy.
How big is GRE Marshan Solar?
It has 1.0 MW of operating capacity. That makes it the 5,895th largest solar plant in the United States and the 64,622nd largest in the world.
Where is GRE Marshan Solar?
In Hastings, Dakota County, Minnesota, United States, at 44.6922, -92.8169.
When was GRE Marshan Solar built?
It started operating in 2017.
How much electricity does GRE Marshan Solar generate?
It reported 1.3 GWh in 2019, a capacity factor of 15%, according to the WRI Global Power Plant Database.
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Solar Power Tracker (2026-02) · GEM Wiki page
- Output 2013–2019WRI Global Power Plant Database v1.3.0 · USA0060935
- GEM plant IDL100000813221
- EIA plant ID60935
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.