Global Power Plant Directory121,919 plants · 219 countries & territories

All plants / Netherlands / Noord-Holland

Graveland 18a solar project

SolarOperatingAssumed PV

Noord-Holland · Netherlands

Operating capacity
7.3 MW
Units
1
Online since
2021
Age
5 yrs

Graveland 18a solar project is a 7.3 MW solar power plant in Noord-Holland, Netherlands.

It has been operating since 2021. By capacity it is the 292nd largest of 748 operating solar plants in the Netherlands.

Owner
—
Coordinates
52.2712, 5.1161 (exact)
GEM plant ID
L100001007494

Plant details

How this solar plant is built and run.

Technology
Assumed PV
Capacity rating
MWac (grid-connection AC capacity)

How it compares

Size among operating solar plants.

In the Netherlands
292nd

of 748 solar plants · see all

In Europe
4,670th

of 28,467

In the world
19,088th

of 79,372 · largest solar plants

Age
5 yrs

Country average for solar: 5 yrs

This plantGraveland 18a solar project
7.3 MW
Average solar plantIn the Netherlands, across 748 plants
9.3 MW
Largest in the NetherlandsVlagtwedde solar farm
110 MW

78% of the average solar plant in the Netherlands. About 7% of the size of the largest.

FAQ

About Graveland 18a solar project.

How big is Graveland 18a solar project?

It has 7.3 MW of operating capacity. That makes it the 292nd largest solar plant in the Netherlands and the 19,088th largest in the world.

Where is Graveland 18a solar project?

In Noord-Holland, Netherlands, at 52.2712, 5.1161.

When was Graveland 18a solar project built?

It started operating in 2021.

What kind of power plant is Graveland 18a solar project?

It is a solar power plant using Assumed PV technology.

Is Graveland 18a solar project still operating?

Yes. 7.3 MW is in operation.

Sources and identifiers

  • Plant dataGlobal Energy Monitor, Global Solar Power Tracker (2026-02) · GEM Wiki page
  • GEM plant IDL100001007494
  • OpenStreetMap unit ID916323572
  • TZ unit ID228688
  • TZ unit ID866556
  • TZ unit ID1237237
  • TZ unit ID1307011
  • WKSL unit ID76253

Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.