- Operating capacity
- 130 MW
- Units
- 2
- Online since
- 2016
- Age
- 10 yrs
Granite Mountain Solar is a 130 MW solar power plant in Iron County, Utah, United States.
It has 2 units, online since 2016. It is owned mainly by Clearway Energy Group LLC and operated by SunEdison; Dominion Energy. By capacity it is the 341st largest of 6,708 operating solar plants in the United States.
- Owner
- Clearway Energy Group LLC
Clearway Energy Group LLC [100%]
- Operator
- SunEdison; Dominion Energy
- Coordinates
- 37.7860, -113.2800 (exact)
- GEM plant ID
- L100000804377
Plant details
How this solar plant is built and run.
- Technology
- PV
- Capacity rating
- MWac (grid-connection AC capacity)
Timeline
When each unit started, retired, or is planned to retire.
- Operating
- Retired
- In development
- Until planned retirement
Units
2 units at this site.
| Unit | Capacity | Status | Start | Technology |
|---|---|---|---|---|
| East | 80 MW | Operating | 2016 | PV |
| West | 50 MW | Operating | 2016 | PV |
Electricity output
How much power this plant produces.
WRI Global Power Plant Database, 2013–2019.
- Latest annual output
- 125 GWh
- Capacity factor
- 11%
- Reported by
- U.S. Energy Information Administration
Reported · 2019
Output as a share of running at full power all year
Show data table
| Year | Reported (GWh) | Estimated (GWh) | Capacity factor | Method |
|---|---|---|---|---|
| 2013 | — | — | — | NO-ESTIMATION |
| 2014 | — | — | — | NO-ESTIMATION |
| 2015 | — | — | — | NO-ESTIMATION |
| 2016 | 25.73 | — | 2% | NO-ESTIMATION |
| 2017 | 127.97 | 125.15 | 11% | SOLAR-V1 |
| 2018 | 123.57 | — | 11% | — |
| 2019 | 125.44 | — | 11% | — |
How it compares
Size among operating solar plants.
- In Americas
- 465th
- Age
- 10 yrs
of 11,032
Country average for solar: 7 yrs
5.6× the average solar plant in the United States. About 14% of the size of the largest.
FAQ
About Granite Mountain Solar.
Who owns Granite Mountain Solar?
Its main owner is Clearway Energy Group LLC. It is operated by SunEdison; Dominion Energy.
How big is Granite Mountain Solar?
It has 130 MW of operating capacity across 2 units. That makes it the 341st largest solar plant in the United States and the 1,904th largest in the world.
Where is Granite Mountain Solar?
In Iron County, Utah, United States, at 37.7860, -113.2800.
When was Granite Mountain Solar built?
It started operating in 2016.
How much electricity does Granite Mountain Solar generate?
It reported 125 GWh in 2019, a capacity factor of 11%, according to the WRI Global Power Plant Database.
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Solar Power Tracker (2026-02) · GEM Wiki page
- Output 2013–2019WRI Global Power Plant Database v1.3.0 · USA0059945
- GEM plant IDL100000804377
- EIA plant ID59945
- EIA plant ID59946
- WKSL unit ID64777
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.