All plants / United States / Vermont
GMP Solar/Storage-Milton Hybrid
Milton · Chittenden County · Vermont · United States
- Operating capacity
- 5.0 MW
- Units
- 1
- Online since
- 2019
- Age
- 7 yrs
GMP Solar/Storage-Milton Hybrid is a 5.0 MW solar power plant in Milton, Vermont, United States.
It has been operating since 2019. It is owned mainly by GMP VT Microgrid LLC and operated by Green Mountain Power. By capacity it is the 1,843rd largest of 6,708 operating solar plants in the United States.
- Owner
- GMP VT Microgrid LLC
GMP VT Microgrid LLC [100%]
- Operator
- Green Mountain Power
- Coordinates
- 44.3921, -73.1023 (exact)
- GEM plant ID
- L100000813183
Plant details
How this solar plant is built and run.
- Technology
- PV
- Capacity rating
- MWac (grid-connection AC capacity)
- Battery storage on site
- Yes
Electricity output
How much power this plant produces.
WRI Global Power Plant Database, 2013–2019.
- Latest annual output
- 1.1 GWh
- Capacity factor
- 2%
- Reported by
- U.S. Energy Information Administration
Reported · 2019
Output as a share of running at full power all year
Show data table
| Year | Reported (GWh) | Estimated (GWh) | Capacity factor | Method |
|---|---|---|---|---|
| 2013 | — | — | — | NO-ESTIMATION |
| 2014 | — | — | — | NO-ESTIMATION |
| 2015 | — | — | — | NO-ESTIMATION |
| 2016 | — | — | — | NO-ESTIMATION |
| 2017 | — | 11.40 | 26% | CAPACITY-FACTOR-V1 |
| 2018 | — | — | — | — |
| 2019 | 1.06 | — | 2% | — |
How it compares
Size among operating solar plants.
- In Americas
- 2,927th
- Age
- 7 yrs
of 11,032
Country average for solar: 7 yrs
22% of the average solar plant in the United States. About 1% of the size of the largest.
FAQ
About GMP Solar/Storage-Milton Hybrid.
Who owns GMP Solar/Storage-Milton Hybrid?
Its main owner is GMP VT Microgrid LLC. It is operated by Green Mountain Power.
How big is GMP Solar/Storage-Milton Hybrid?
It has 5.0 MW of operating capacity. That makes it the 1,843rd largest solar plant in the United States and the 23,966th largest in the world.
Where is GMP Solar/Storage-Milton Hybrid?
In Milton, Chittenden County, Vermont, United States, at 44.3921, -73.1023.
When was GMP Solar/Storage-Milton Hybrid built?
It started operating in 2019.
How much electricity does GMP Solar/Storage-Milton Hybrid generate?
It reported 1.1 GWh in 2019, a capacity factor of 2%, according to the WRI Global Power Plant Database.
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Solar Power Tracker (2026-02) · GEM Wiki page
- Output 2013–2019WRI Global Power Plant Database v1.3.0 · USA0062381
- GEM plant IDL100000813183
- EIA plant ID62381
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.