Global Power Plant Directory121,919 plants · 219 countries & territories

All plants / Germany / Brandenburg

Finsterwalde Solarpark

SolarOperatingPV

Lichterfeld-Schacksdorf · Elbe-Elster · Brandenburg · Germany

Operating capacity
76 MW
Units
4
Online since
2009
Age
17 yrs

Finsterwalde Solarpark is a 76 MW solar power plant in Lichterfeld-Schacksdorf, Brandenburg, Germany.

It has 4 units, which came online between 2009 and 2010. By capacity it is the 26th largest of 7,617 operating solar plants in Germany.

Owner
—
Operator
LHI PV MITAB 1785
Coordinates
51.5656, 13.7282 (exact)
GEM plant ID
L100000805891

Plant details

How this solar plant is built and run.

Technology
PV
Capacity rating
MWp/dc (panel DC capacity)

Timeline

When each unit started, retired, or is planned to retire.

  • Operating
  • Retired
  • In development
  • Until planned retirement

Units

4 units at this site.

UnitCapacityStatusStartTechnology
1a 22 MW Operating 2009PV
1b 20 MW Operating 2009PV
2 20 MW Operating 2010PV
3 14 MW Operating 2010PV

Electricity output

How much power this plant produces.

WRI Global Power Plant Database, 2013–2019.

ReportedEstimated
Latest annual output
119 GWh

Estimated · 2017

Capacity factor
18%

Output as a share of running at full power all year

Estimation method
Solar model
Show data table
YearReported (GWh)Estimated (GWh)Capacity factorMethod
2013 — 114.13 17% SOLAR-V1-NO-AGE
2014 — 116.93 18% SOLAR-V1-NO-AGE
2015 — 117.06 18% SOLAR-V1-NO-AGE
2016 — 119.38 18% SOLAR-V1-NO-AGE
2017 — 119.23 18% SOLAR-V1-NO-AGE
2018 — — — —
2019 — — — —

How it compares

Size among operating solar plants.

In Germany
26th

of 7,617 solar plants · see all

In Europe
197th

of 28,467

In the world
3,871st

of 79,372 · largest solar plants

Age
17 yrs

Country average for solar: 8 yrs

This plantFinsterwalde Solarpark
76 MW
Average solar plantIn Germany, across 7,617 plants
5.0 MW
Largest in GermanyWitznitz solar farm
467 MW

15× the average solar plant in Germany. About 16% of the size of the largest.

FAQ

About Finsterwalde Solarpark.

How big is Finsterwalde Solarpark?

It has 76 MW of operating capacity across 4 units. That makes it the 26th largest solar plant in Germany and the 3,871st largest in the world.

Where is Finsterwalde Solarpark?

In Lichterfeld-Schacksdorf, Elbe-Elster, Brandenburg, Germany, at 51.5656, 13.7282.

When was Finsterwalde Solarpark built?

Its first unit started in 2009 and its newest in 2010.

How much electricity does Finsterwalde Solarpark generate?

An estimated 119 GWh was generated in 2017, a capacity factor of 18%, according to the WRI Global Power Plant Database.

What kind of power plant is Finsterwalde Solarpark?

It is a solar power plant using PV technology.

Sources and identifiers

  • Plant dataGlobal Energy Monitor, Global Solar Power Tracker (2026-02) · GEM Wiki page
  • Output 2013–2019WRI Global Power Plant Database v1.3.0 · WRI1025882
  • GEM plant IDL100000805891
  • World Resources Institute plant IDWri1025882
  • MaStR unit IDSEE901437763714
  • MaStR unit IDSEE902477425655
  • MaStR unit IDSEE905440200785
  • MaStR unit IDSEE908593275419
  • MaStR unit IDSEE908609081850
  • MaStR unit IDSEE909311193336
  • MaStR unit IDSEE917817447983
  • MaStR unit IDSEE918950420536
  • MaStR unit IDSEE926246865442
  • MaStR unit IDSEE928847049986
  • MaStR unit IDSEE930310633905

Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.