Global Power Plant Directory121,919 plants · 219 countries & territories

All plants / Switzerland / Albula

Filisur hydroelectric plant

HydroOperatingRun-of-river

Bergün Filisur · Grisons · Albula · Switzerland

Operating capacity
65 MW
Units
1
Online since
1967
Age
59 yrs

Filisur hydroelectric plant is a 65 MW hydropower plant in Bergün Filisur, Albula, Switzerland.

It has been operating since 1967. It is a run-of-river plant on the Albula. It is owned mainly by Axpo Power AG. By capacity it is the 67th largest of 196 operating hydropower plants in Switzerland.

Owner
Axpo Power AG

Canton of Graubünden [5%]; Elektrizitatswerk Davos [15%]; Axpo Power AG [75%]

Coordinates
46.6721, 9.6880 (exact)
GEM plant ID
L100001023270

Plant details

How this hydropower plant is built and run.

Type
Run-of-river
River
Albula
Turbines
2 turbines

Electricity output

How much power this plant produces.

WRI Global Power Plant Database, 2013–2019.

ReportedEstimated
Latest annual output
213 GWh

Estimated · 2017

Capacity factor
37%

Output as a share of running at full power all year

Estimation method
Hydro model
Show data table
YearReported (GWh)Estimated (GWh)Capacity factorMethod
2013 — 184.49 32% HYDRO-V1
2014 — 196.23 34% HYDRO-V1
2015 — 195.35 34% HYDRO-V1
2016 — 191.20 34% HYDRO-V1
2017 — 212.63 37% HYDRO-V1
2018 — — — —
2019 — — — —

How it compares

Size among operating hydropower plants.

In Switzerland
67th

of 196 hydropower plants · see all

In Europe
782nd

of 1,398

In the world
3,121st

of 9,108 · largest hydropower plants

Age
59 yrs

Country average for hydropower: 72 yrs

This plantFilisur hydroelectric plant
65 MW
Average hydropower plantIn Switzerland, across 196 plants
80 MW
Largest in SwitzerlandBieudron hydroelectric plant
1.3 GW

82% of the average hydropower plant in Switzerland. About 5% of the size of the largest.

FAQ

About Filisur hydroelectric plant.

Who owns Filisur hydroelectric plant?

Its main owner is Axpo Power AG.

How big is Filisur hydroelectric plant?

It has 65 MW of operating capacity. That makes it the 67th largest hydropower plant in Switzerland and the 3,121st largest in the world.

Where is Filisur hydroelectric plant?

In Bergün Filisur, Grisons, Albula, Switzerland, at 46.6721, 9.6880.

When was Filisur hydroelectric plant built?

It started operating in 1967.

Which river is Filisur hydroelectric plant on?

The Albula.

Sources and identifiers

  • Plant dataGlobal Energy Monitor, Global Hydropower Tracker (2026-03) · GEM Wiki page
  • Output 2013–2019WRI Global Power Plant Database v1.3.0 · WRI1004177
  • GEM plant IDL100001023270
  • WEPP ID1010012

Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.