- Operating capacity
- 70 MW
- Units
- 2
- Online since
- 2023
- Age
- 3 yrs
Criterion wind farm is a 70 MW wind power plant in GARRETT County, Maryland, United States.
It has 2 units, which came online between 2010 and 2023. It is owned mainly by Exelon. By capacity it is the 917th largest of 1,465 operating wind plants in the United States.
- Owner
- Exelon
- Retired
- 70 MW (last in 2023)
- Coordinates
- 39.3743, -79.3344 (exact)
- GEM plant ID
- L100000906794
Plant details
How this wind plant is built and run.
- Installation
- Onshore
Timeline
When each unit started, retired, or is planned to retire.
- Operating
- Retired
- In development
- Until planned retirement
Units
2 units at this site.
| Unit | Capacity | Status | Start | Technology |
|---|---|---|---|---|
| 1.0 | 70 MW | Retired | 2010 | Onshore |
| RP | 70 MW | Operating | 2023 | Onshore |
Electricity output
How much power this plant produces.
WRI Global Power Plant Database, 2013–2019.
- Latest annual output
- 172 GWh
- Capacity factor
- 28%
- Reported by
- U.S. Energy Information Administration
Reported · 2019
Output as a share of running at full power all year
Show data table
| Year | Reported (GWh) | Estimated (GWh) | Capacity factor | Method |
|---|---|---|---|---|
| 2013 | 175.37 | 234.71 | 29% | WIND-V1 |
| 2014 | 174.60 | 211.79 | 28% | WIND-V1 |
| 2015 | 170.19 | 222.75 | 28% | WIND-V1 |
| 2016 | 182.56 | 221.55 | 30% | WIND-V1 |
| 2017 | 189.72 | 213.99 | 31% | WIND-V1 |
| 2018 | 194.41 | — | 32% | — |
| 2019 | 171.62 | — | 28% | — |
How it compares
Size among operating wind plants.
- In Americas
- 1,055th
- Age
- 3 yrs
of 1,910
Country average for wind: 13 yrs
51% of the average wind plant in the United States. About 6% of the size of the largest.
FAQ
About Criterion wind farm.
Who owns Criterion wind farm?
Its main owner is Exelon.
How big is Criterion wind farm?
It has 70 MW of operating capacity across 2 units. That makes it the 917th largest wind plant in the United States and the 4,396th largest in the world.
Where is Criterion wind farm?
In GARRETT County, Maryland, United States, at 39.3743, -79.3344.
When was Criterion wind farm built?
Its first unit started in 2010 and its newest in 2023.
How much electricity does Criterion wind farm generate?
It reported 172 GWh in 2019, a capacity factor of 28%, according to the WRI Global Power Plant Database.
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Wind Power Tracker (2026-02) · GEM Wiki page
- Output 2013–2019WRI Global Power Plant Database v1.3.0 · USA0057300
- GEM plant IDL100000906794
- WEPP ID50727
- EIA plant ID57300
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.