All plants / Brazil / Mato Grosso
Colíder hydroelectric plant
Usina Hidrelétrica Colíder
Região Geográfica Intermediária de Sinop · Mato Grosso · Brazil
- Operating capacity
- 300 MW
- Units
- 1
- Online since
- 2019
- Age
- 7 yrs
Colíder hydroelectric plant is a 300 MW hydropower plant in Região Geográfica Intermediária de Sinop, Mato Grosso, Brazil.
It has been operating since 2019. It is a run-of-river plant on the Rio Teles Pires. It is owned mainly by Companhia Paranaense de Energia (COPEL) and operated by Copel Geração e Transmissão. By capacity it is the 69th largest of 710 operating hydropower plants in Brazil.
- Owner
- Companhia Paranaense de Energia (COPEL)
Companhia Paranaense de Energia (COPEL) [100%]
- Operator
- Copel Geração e Transmissão
- Coordinates
- -10.9848, -55.7660 (exact)
- GEM plant ID
- L100000600235
Plant details
How this hydropower plant is built and run.
- Type
- Run-of-river
- River
- Rio Teles Pires
- Turbines
- 3 x 100 MW
How it compares
Size among operating hydropower plants.
- In Americas
- 242nd
- Age
- 7 yrs
of 1,102
Country average for hydropower: 34 yrs
1.8× the average hydropower plant in Brazil. About 2% of the size of the largest.
FAQ
About Colíder hydroelectric plant.
Who owns Colíder hydroelectric plant?
Its main owner is Companhia Paranaense de Energia (COPEL). It is operated by Copel Geração e Transmissão.
How big is Colíder hydroelectric plant?
It has 300 MW of operating capacity. That makes it the 69th largest hydropower plant in Brazil and the 910th largest in the world.
Where is Colíder hydroelectric plant?
In Região Geográfica Intermediária de Sinop, Mato Grosso, Brazil, at -10.9848, -55.7660.
When was Colíder hydroelectric plant built?
It started operating in 2019.
Which river is Colíder hydroelectric plant on?
The Rio Teles Pires.
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Hydropower Tracker (2026-03) · GEM Wiki page
- GEM plant IDL100000600235
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.