All plants / China / Inner Mongolia
Chifeng Economic Development Zone Captive Cogen power station
赤峰经济开发区自备热电联产项目
Yuanbaoshan Town · Yuanbaoshan · Chifeng · Inner Mongolia · China
- Operating capacity
- 700 MW
- Units
- 2
- Online since
- 2021
- CO₂ a year
- 3.1 Mt
Chifeng Economic Development Zone Captive Cogen power station is a 700 MW coal power plant in Yuanbaoshan Town, Inner Mongolia, China.
It has 2 units, online since 2021. Its boilers are supercritical, burning lignite coal. It is owned mainly by Chifeng Economic Development Zone Power Generation Co Ltd. Traced to the top of the ownership chain, its largest owner is State-owned Assets Supervision and Administration Commission of Chifeng Municipal Government (100%). Global Energy Monitor estimates it emits about 3.1 million tonnes of CO₂ a year. By capacity it is the 530th largest of 1,225 operating coal plants in China.
- Owner
- Chifeng Economic Development Zone Power Generation Co Ltd
Chifeng Economic Development Zone Power Generation Co Ltd [100%]
- Parent company
- Chifeng State Owned Capital Operation (Group) Co Ltd [75.0%]; Chifeng Infrastructure Investment Development Co Ltd [25.0%]
- Coordinates
- 42.2737, 119.1442 (exact)
- GEM plant ID
- L100000100808
Plant details
How this coal plant is built and run.
- Combustion technology
- Supercritical
- Coal type
- Lignite
- Coal source
- Domestic
- Combined heat and power
- Yes
- Captive plant
- Supplies other metals & mining industry (power and heat)
- Permit
- December 26, 2016
- State ownership
- 100% · full state-owned enterprise
Climate
Carbon dioxide from this plant, as estimated by Global Energy Monitor.
- CO₂ a year
- 3.14 Mt
- CO₂ over remaining life
- 94 Mt
- Capacity factor
- 52%
- Efficiency
- 37%
Million tonnes, operating units
Up to 30 more years of operation
Country average GEM assumes for its coal fleet, not this plant's own figure
From a heat rate of 9,250 Btu/kWh
Retirement and national pledges
- Planned retirement
- Not announced
- Coal phase-out pledge
- None recorded
- Net-zero target
- 2060in 34 years
No retirement date has been announced, so nothing yet ties the plant to China’s 2060 net-zero target. Pledges are national commitments recorded by Global Energy Monitor.
Timeline
When each unit started, retired, or is planned to retire.
- Operating
- Retired
- In development
- Until planned retirement
Who owns it
Direct owners, and the owners at the top of each chain, as a share of operating capacity.
Direct owners
Ownership chain
- State-owned Assets Supervision and Administration Commission of Chifeng Municipal Government State bodyowns 100% of Chifeng State Owned Capital Operation (Group)
- Chifeng State Owned Capital Operation (Group) Companyowns 75% of Chifeng Economic Development Zone Power Generation
- Chifeng Economic Development Zone Power Generation Companyowns 100% of this plant
Ultimately owned by
- State-owned Assets Supervision and Administration Commission of Chifeng Municipal Government State body100%
At least 100% traced to a government or state body.
See every plant owned by
Source: Global Energy Monitor, Global Energy Ownership Tracker, September 2026 (CC BY 4.0). Capacity is weighted by each owner’s share.
Units
2 units at this site.
| Unit | Capacity | Status | Start | Retired / planned | Technology | Coal | CO₂ a year |
|---|---|---|---|---|---|---|---|
| Unit 1 | 350 MW | Operating | 2021 | — | Supercritical | Lignite | 1.57 Mt |
| Unit 2 | 350 MW | Operating | 2021 | — | Supercritical | Lignite | 1.57 Mt |
How it compares
Size among operating coal plants.
- In Asia
- 772nd
- Age
- 5 yrs
of 1,872
Country average for coal: 16 yrs
67% of the average coal plant in China. About 10% of the size of the largest.
FAQ
About Chifeng Economic Development Zone Captive Cogen power station.
Who owns Chifeng Economic Development Zone Captive Cogen power station?
Its main owner is Chifeng Economic Development Zone Power Generation Co Ltd. Traced to the top of each ownership chain, its owners are State-owned Assets Supervision and Administration Commission of Chifeng Municipal Government (100%).
How big is Chifeng Economic Development Zone Captive Cogen power station?
It has 700 MW of operating capacity across 2 units. That makes it the 530th largest coal plant in China and the 982nd largest in the world.
Where is Chifeng Economic Development Zone Captive Cogen power station?
In Yuanbaoshan Town, Yuanbaoshan, Chifeng, Inner Mongolia, China, at 42.2737, 119.1442.
When was Chifeng Economic Development Zone Captive Cogen power station built?
It started operating in 2021.
How much CO₂ does Chifeng Economic Development Zone Captive Cogen power station emit?
Global Energy Monitor estimates about 3.1 million tonnes of CO₂ a year, and 94 million tonnes over the rest of its expected life.
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Coal Plant Tracker (2026-07) · GEM Wiki page
- OwnershipGlobal Energy Monitor, Global Energy Ownership Tracker, September 2026
- GEM plant IDL100000100808