Global Power Plant Directory121,919 plants · 219 countries & territories

All plants / China / Inner Mongolia

Chifeng Economic Development Zone Captive Cogen power station

赤峰经济开发区自备热电联产项目

CoalOperatingSupercritical

Yuanbaoshan Town · Yuanbaoshan · Chifeng · Inner Mongolia · China

Operating capacity
700 MW
Units
2
Online since
2021
CO₂ a year
3.1 Mt

Chifeng Economic Development Zone Captive Cogen power station is a 700 MW coal power plant in Yuanbaoshan Town, Inner Mongolia, China.

It has 2 units, online since 2021. Its boilers are supercritical, burning lignite coal. It is owned mainly by Chifeng Economic Development Zone Power Generation Co Ltd. Traced to the top of the ownership chain, its largest owner is State-owned Assets Supervision and Administration Commission of Chifeng Municipal Government (100%). Global Energy Monitor estimates it emits about 3.1 million tonnes of CO₂ a year. By capacity it is the 530th largest of 1,225 operating coal plants in China.

Owner
Chifeng Economic Development Zone Power Generation Co Ltd

Chifeng Economic Development Zone Power Generation Co Ltd [100%]

Parent company
Chifeng State Owned Capital Operation (Group) Co Ltd [75.0%]; Chifeng Infrastructure Investment Development Co Ltd [25.0%]
Coordinates
42.2737, 119.1442 (exact)
GEM plant ID
L100000100808

Plant details

How this coal plant is built and run.

Combustion technology
Supercritical
Coal type
Lignite
Coal source
Domestic
Combined heat and power
Yes
Captive plant
Supplies other metals & mining industry (power and heat)
Permit
December 26, 2016
State ownership
100% · full state-owned enterprise

Climate

Carbon dioxide from this plant, as estimated by Global Energy Monitor.

CO₂ a year
3.14 Mt

Million tonnes, operating units

CO₂ over remaining life
94 Mt

Up to 30 more years of operation

Capacity factor
52%

Country average GEM assumes for its coal fleet, not this plant's own figure

Efficiency
37%

From a heat rate of 9,250 Btu/kWh

Retirement and national pledges

Planned retirement
Not announced
Coal phase-out pledge
None recorded
Net-zero target
2060in 34 years

No retirement date has been announced, so nothing yet ties the plant to China’s 2060 net-zero target. Pledges are national commitments recorded by Global Energy Monitor.

Timeline

When each unit started, retired, or is planned to retire.

  • Operating
  • Retired
  • In development
  • Until planned retirement

Who owns it

Direct owners, and the owners at the top of each chain, as a share of operating capacity.

Direct owners

Ownership chain

  1. State-owned Assets Supervision and Administration Commission of Chifeng Municipal Government State bodyowns 100% of Chifeng State Owned Capital Operation (Group)
  2. Chifeng State Owned Capital Operation (Group) Companyowns 75% of Chifeng Economic Development Zone Power Generation
  3. Chifeng Economic Development Zone Power Generation Companyowns 100% of this plant

Ultimately owned by

At least 100% traced to a government or state body.

Source: Global Energy Monitor, Global Energy Ownership Tracker, September 2026 (CC BY 4.0). Capacity is weighted by each owner’s share.

Units

2 units at this site.

UnitCapacityStatusStartRetired / plannedTechnologyCoalCO₂ a year
Unit 1 350 MW Operating 2021—SupercriticalLignite1.57 Mt
Unit 2 350 MW Operating 2021—SupercriticalLignite1.57 Mt

How it compares

Size among operating coal plants.

In China
530th

of 1,225 coal plants · see all

In Asia
772nd

of 1,872

In the world
982nd

of 2,643 · largest coal plants

Age
5 yrs

Country average for coal: 16 yrs

This plantChifeng Economic Development Zone Captive Cogen power station
700 MW
Average coal plantIn China, across 1,225 plants
1.0 GW
Largest in ChinaBeilun power station
7.1 GW

67% of the average coal plant in China. About 10% of the size of the largest.

FAQ

About Chifeng Economic Development Zone Captive Cogen power station.

Who owns Chifeng Economic Development Zone Captive Cogen power station?

Its main owner is Chifeng Economic Development Zone Power Generation Co Ltd. Traced to the top of each ownership chain, its owners are State-owned Assets Supervision and Administration Commission of Chifeng Municipal Government (100%).

How big is Chifeng Economic Development Zone Captive Cogen power station?

It has 700 MW of operating capacity across 2 units. That makes it the 530th largest coal plant in China and the 982nd largest in the world.

Where is Chifeng Economic Development Zone Captive Cogen power station?

In Yuanbaoshan Town, Yuanbaoshan, Chifeng, Inner Mongolia, China, at 42.2737, 119.1442.

When was Chifeng Economic Development Zone Captive Cogen power station built?

It started operating in 2021.

How much CO₂ does Chifeng Economic Development Zone Captive Cogen power station emit?

Global Energy Monitor estimates about 3.1 million tonnes of CO₂ a year, and 94 million tonnes over the rest of its expected life.

Sources and identifiers

Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.