- Operating capacity
- 450 MW
- Units
- 13
- Online since
- 2014
- CO₂ a year
- 3.0 Mt
Cherepetskaya power station is a 450 MW coal power plant in Suvorov, Tula, Russia.
It has 13 units, which came online between 1953 and 2015. Its boilers are subcritical, burning bituminous coal. It is owned mainly by Inter RAO – Electric Power Generation JSC. Traced to the top of the ownership chain, its largest owner is Government of Russia (33%). Global Energy Monitor estimates it emits about 3.0 million tonnes of CO₂ a year. By capacity it is the 33rd largest of 99 operating coal plants in Russia.
- Owner
- Inter RAO – Electric Power Generation JSC
Inter RAO – Electric Power Generation JSC [100%]
- Parent company
- Inter RAO PJSC [100.0%]
- In development
- 450 MW
- Retired
- 1.4 GW (last in 2017)
- Coordinates
- 54.1360, 36.4800 (exact)
- GEM plant ID
- L100000103389
Plant details
How this coal plant is built and run.
- Combustion technology
- Subcritical, ultra-supercritical
- Coal type
- Bituminous, lignite
- Coal source
- Domestic
- Coal supply notes
- Kuznetsk Basin
- Planned conversion
- To fossil gas: natural gas
- State ownership
- 33% · partial state-owned enterprise
Climate
Carbon dioxide from this plant, as estimated by Global Energy Monitor.
- CO₂ a year
- 2.98 Mt
- CO₂ over remaining life
- 70 Mt
- Capacity factor
- 67%
- Efficiency
- 30%
Million tonnes, operating units
Up to 24 more years of operation
Country average GEM assumes for its coal fleet, not this plant's own figure
From a heat rate of 11,313 Btu/kWh
Retirement and national pledges
- Planned retirement
- Not announced
- Coal phase-out pledge
- None recorded
- Net-zero target
- 2060in 34 years
No retirement date has been announced, so nothing yet ties the plant to Russia’s 2060 net-zero target. Pledges are national commitments recorded by Global Energy Monitor.
Timeline
When each unit started, retired, or is planned to retire.
- Operating
- Retired
- In development
- Until planned retirement
Who owns it
Direct owners, and the owners at the top of each chain, as a share of operating capacity.
Direct owners
- Inter RAO – Electric Power Generation Company100%
Ownership chain
- Inter RAO Capital Companyowns 29.6% of Inter RAO
- Inter RAO Companyowns 100% of Inter RAO – Electric Power Generation
- Inter RAO – Electric Power Generation Companyowns 100% of this plant
Ultimately owned by
- Share not traceable37.5%
- Government of Russia Government32.9%
At least 32.9% traced to a government or state body.
See every plant owned by
Source: Global Energy Monitor, Global Energy Ownership Tracker, September 2026 (CC BY 4.0). Capacity is weighted by each owner’s share.
Units
13 units at this site.
| Unit | Capacity | Status | Start | Retired / planned | Technology | Coal | CO₂ a year |
|---|---|---|---|---|---|---|---|
| Unit 1 | 140 MW | Retired | 1953 | 2017 | Subcritical | Lignite | — |
| Unit 2 | 140 MW | Retired | 1954 | 2017 | Subcritical | Lignite | — |
| Unit 3 | 140 MW | Retired | 1956 | 2017 | Subcritical | Lignite | — |
| Unit 4 | 140 MW | Retired | 1958 | 2017 | Subcritical | Lignite | — |
| Unit 5 | 300 MW | Retired | 1963 | 2017 | Ultra-supercritical | Bituminous | — |
| Unit 6 | 300 MW | Retired | 1964 | 2017 | Ultra-supercritical | Bituminous | — |
| Unit 7 | 265 MW | Retired | 1966 | 2017 | — | Bituminous | — |
| Unit 8, timepoint 1 | 225 MW | Operating | 2014 | — | Subcritical | Bituminous | 1.49 Mt |
| Unit 9, timepoint 1 | 225 MW | Operating | 2015 | — | Subcritical | Bituminous | 1.49 Mt |
| CC1 | 300 MW | Cancelled | — | — | Combined cycle | Fossil gas: natural gas | — |
| CC2 | 300 MW | Cancelled | — | — | Combined cycle | Fossil gas: natural gas | — |
| Unit 8, timepoint 2 | 225 MW | Announced | — | — | Steam turbine | Fossil gas: natural gas | — |
| Unit 9, timepoint 2 | 225 MW | Announced | — | — | Steam turbine | Fossil gas: natural gas | — |
Electricity output
How much power this plant produces.
WRI Global Power Plant Database, 2013–2019.
- Latest annual output
- 1.6 TWh
- Capacity factor
- 39%
- Estimation method
- CAPACITY-FACTOR-V1
Estimated · 2017
Output as a share of running at full power all year
Show data table
| Year | Reported (GWh) | Estimated (GWh) | Capacity factor | Method |
|---|---|---|---|---|
| 2013 | — | — | — | NO-ESTIMATION |
| 2014 | — | — | — | NO-ESTIMATION |
| 2015 | — | — | — | NO-ESTIMATION |
| 2016 | — | — | — | NO-ESTIMATION |
| 2017 | — | 1,554.48 | 39% | CAPACITY-FACTOR-V1 |
| 2018 | — | — | — | — |
| 2019 | — | — | — | — |
How it compares
Size among operating coal plants.
- In Europe
- 92nd
- Age
- 12 yrs
of 197
Country average for coal: 51 yrs
About average for Russia. About 12% of the size of the largest.
FAQ
About Cherepetskaya power station.
Who owns Cherepetskaya power station?
Its main owner is Inter RAO – Electric Power Generation JSC. Traced to the top of each ownership chain, its owners are Government of Russia (33%).
How big is Cherepetskaya power station?
It has 450 MW of operating capacity across 13 units. That makes it the 33rd largest coal plant in Russia and the 1,465th largest in the world.
Where is Cherepetskaya power station?
In Suvorov, Tula, Russia, at 54.1360, 36.4800.
When was Cherepetskaya power station built?
Its first unit started in 1953 and its newest in 2015.
How much CO₂ does Cherepetskaya power station emit?
Global Energy Monitor estimates about 3.0 million tonnes of CO₂ a year, and 70 million tonnes over the rest of its expected life.
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Coal Plant Tracker (2026-07) · GEM Wiki page
- OwnershipGlobal Energy Monitor, Global Energy Ownership Tracker, September 2026
- Output 2013–2019WRI Global Power Plant Database v1.3.0 · WRI1003683
- GEM plant IDL100000103389
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.