All plants / United States / California
Camino hydroelectric plant
Camino · El Dorado County · California · United States
- Operating capacity
- 158 MW
- Units
- 1
- Online since
- 1963
- Age
- 63 yrs
Camino hydroelectric plant is a 158 MW hydropower plant in Camino, California, United States.
It has been operating since 1963. It is a conventional storage plant on the Silver Creek. It is owned mainly by Sacramento Municipal Utility District. By capacity it is the 128th largest of 1,436 operating hydropower plants in the United States.
- Owner
- Sacramento Municipal Utility District
Sacramento Municipal Utility District [100%]
- Coordinates
- 38.8288, -120.5370 (exact)
- GEM plant ID
- L100000603752
Plant details
How this hydropower plant is built and run.
- Type
- Conventional storage
- River
- Silver Creek
- Turbines
- 2 x 78.9 MW
Electricity output
How much power this plant produces.
WRI Global Power Plant Database, 2013–2019.
- Latest annual output
- 464 GWh
- Capacity factor
- 34%
- Reported by
- U.S. Energy Information Administration
Reported · 2019
Output as a share of running at full power all year
Show data table
| Year | Reported (GWh) | Estimated (GWh) | Capacity factor | Method |
|---|---|---|---|---|
| 2013 | 211.26 | 369.48 | 15% | HYDRO-V1 |
| 2014 | 153.93 | 330.29 | 11% | HYDRO-V1 |
| 2015 | 101.98 | 329.31 | 7% | HYDRO-V1 |
| 2016 | 404.00 | 357.15 | 29% | HYDRO-V1 |
| 2017 | 479.60 | 332.65 | 35% | HYDRO-V1 |
| 2018 | 291.17 | — | 21% | — |
| 2019 | 464.03 | — | 34% | — |
How it compares
Size among operating hydropower plants.
- Age
- 63 yrs
Country average for hydropower: 71 yrs
2.2× the average hydropower plant in the United States. About 4% of the size of the largest.
FAQ
About Camino hydroelectric plant.
Who owns Camino hydroelectric plant?
Its main owner is Sacramento Municipal Utility District.
How big is Camino hydroelectric plant?
It has 158 MW of operating capacity. That makes it the 128th largest hydropower plant in the United States and the 1,629th largest in the world.
Where is Camino hydroelectric plant?
In Camino, El Dorado County, California, United States, at 38.8288, -120.5370.
When was Camino hydroelectric plant built?
It started operating in 1963.
Which river is Camino hydroelectric plant on?
The Silver Creek.
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Hydropower Tracker (2026-03) · GEM Wiki page
- Output 2013–2019WRI Global Power Plant Database v1.3.0 · USA0000430
- GEM plant IDL100000603752
- WEPP ID31868
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.