Global Power Plant Directory121,919 plants · 219 countries & territories

All plants / Portugal

Caldas wind farm

WindOperatingOnshore

Alguber · Lisbon · Portugal

Operating capacity
10 MW
Units
1
Online since
2005
Age
21 yrs

Caldas wind farm is a 10 MW wind power plant in Alguber, Lisbon, Portugal.

It has been operating since 2005. It is owned mainly by EDP Renováveis and operated by EDP Renováveis Portugal. By capacity it is the 130th largest of 234 operating wind plants in Portugal.

Owner
EDP Renováveis

EDP Renováveis [100%]

Operator
EDP Renováveis Portugal
Coordinates
39.2948, -9.0126 (exact)
GEM plant ID
L100000907764

Plant details

How this wind plant is built and run.

Installation
Onshore

Electricity output

How much power this plant produces.

WRI Global Power Plant Database, 2013–2019.

ReportedEstimated
Latest annual output
22 GWh

Estimated · 2017

Capacity factor
25%

Output as a share of running at full power all year

Estimation method
Wind model
Show data table
YearReported (GWh)Estimated (GWh)Capacity factorMethod
2013 — 24.29 28% WIND-V1
2014 — 24.05 27% WIND-V1
2015 — 24.16 28% WIND-V1
2016 — 23.52 27% WIND-V1
2017 — 21.89 25% WIND-V1
2018 — — — —
2019 — — — —

How it compares

Size among operating wind plants.

In Portugal
130th

of 234 wind plants · see all

In Europe
6,055th

of 7,126

In the world
15,107th

of 17,121 · largest wind plants

Age
21 yrs

Country average for wind: 18 yrs

This plantCaldas wind farm
10 MW
Average wind plantIn Portugal, across 234 plants
26 MW
Largest in PortugalVentominho wind farm
293 MW

38% of the average wind plant in Portugal. About 3% of the size of the largest.

FAQ

About Caldas wind farm.

Who owns Caldas wind farm?

Its main owner is EDP Renováveis. It is operated by EDP Renováveis Portugal.

How big is Caldas wind farm?

It has 10 MW of operating capacity. That makes it the 130th largest wind plant in Portugal and the 15,107th largest in the world.

Where is Caldas wind farm?

In Alguber, Lisbon, Portugal, at 39.2948, -9.0126.

When was Caldas wind farm built?

It started operating in 2005.

How much electricity does Caldas wind farm generate?

An estimated 22 GWh was generated in 2017, a capacity factor of 25%, according to the WRI Global Power Plant Database.

Sources and identifiers

  • Plant dataGlobal Energy Monitor, Global Wind Power Tracker (2026-02) · GEM Wiki page
  • Output 2013–2019WRI Global Power Plant Database v1.3.0 · WRI1023314
  • GEM plant IDL100000907764
  • WEPP ID1059959
  • World Resources Institute plant IDWRI1023314

Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.