Global Power Plant Directory121,919 plants · 219 countries & territories

All plants / Spain / Comunidad Foral de Navarra

Cabanillas wind farm

WindOperatingOnshore

Cabanillas · La Ribera · Comunidad Foral de Navarra · Spain

Operating capacity
50 MW
Units
1
Online since
2020
Age
6 yrs

Cabanillas wind farm is a 50 MW wind power plant in Cabanillas, Comunidad Foral de Navarra, Spain.

It has been operating since 2020. It is owned mainly by Grupo Enhol. By capacity it is the 85th largest of 939 operating wind plants in Spain.

Owner
Grupo Enhol

Grupo Enhol [100%]

Operator
Grupo Enhol
Coordinates
42.0318, -1.5278 (approximate)
GEM plant ID
L100000914868

Plant details

How this wind plant is built and run.

Installation
Onshore

Electricity output

How much power this plant produces.

WRI Global Power Plant Database, 2013–2019.

ReportedEstimated
Latest annual output
32 GWh

Estimated · 2017

Capacity factor
7%

Output as a share of running at full power all year

Estimation method
CAPACITY-FACTOR-V1
Show data table
YearReported (GWh)Estimated (GWh)Capacity factorMethod
2013 — — — NO-ESTIMATION
2014 — — — NO-ESTIMATION
2015 — — — NO-ESTIMATION
2016 — — — NO-ESTIMATION
2017 — 31.90 7% CAPACITY-FACTOR-V1
2018 — — — —
2019 — — — —

How it compares

Size among operating wind plants.

In Spain
85th

of 939 wind plants · see all

In Europe
831st

of 7,126

In the world
5,199th

of 17,121 · largest wind plants

Age
6 yrs

Country average for wind: 18 yrs

This plantCabanillas wind farm
50 MW
Average wind plantIn Spain, across 939 plants
36 MW
Largest in SpainLas Majas wind farm
465 MW

1.4× the average wind plant in Spain. About 11% of the size of the largest.

FAQ

About Cabanillas wind farm.

Who owns Cabanillas wind farm?

Its main owner is Grupo Enhol.

How big is Cabanillas wind farm?

It has 50 MW of operating capacity. That makes it the 85th largest wind plant in Spain and the 5,199th largest in the world.

Where is Cabanillas wind farm?

In Cabanillas, La Ribera, Comunidad Foral de Navarra, Spain, at 42.0318, -1.5278.

When was Cabanillas wind farm built?

It started operating in 2020.

How much electricity does Cabanillas wind farm generate?

An estimated 32 GWh was generated in 2017, a capacity factor of 7%, according to the WRI Global Power Plant Database.

Sources and identifiers

  • Plant dataGlobal Energy Monitor, Global Wind Power Tracker (2026-02) · GEM Wiki page
  • Output 2013–2019WRI Global Power Plant Database v1.3.0 · WRI1007399
  • GEM plant IDL100000914868
  • WEPP ID1065360

Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.