All plants / Russia / Amur Oblast
Bureyskaya hydroelectric plant
Бурейская ГЭС
Bureysky District · Amur Oblast · Russia
- Operating capacity
- 2.0 GW
- Units
- 1
- Online since
- 2003
- Age
- 23 yrs
Bureyskaya hydroelectric plant is a 2.0 GW hydropower plant in Bureysky District, Amur Oblast, Russia.
It has been operating since 2003. It is a conventional storage plant on the Bureya River. It is owned mainly by PJSC RusHydro and operated by Bureyskaya HPP. By capacity it is the 8th largest of 117 operating hydropower plants in Russia.
- Owner
- PJSC RusHydro
PJSC RusHydro [100%]
- Operator
- Bureyskaya HPP
- Coordinates
- 50.2701, 130.3136 (exact)
- GEM plant ID
- L100000603232
Plant details
How this hydropower plant is built and run.
- Type
- Conventional storage
- River
- Bureya River
- Turbines
- 6 x 339.5 MW
Electricity output
How much power this plant produces.
WRI Global Power Plant Database, 2013–2019.
- Latest annual output
- 4.8 TWh
- Capacity factor
- 27%
- Estimation method
- Hydro model
Estimated · 2017
Output as a share of running at full power all year
Show data table
| Year | Reported (GWh) | Estimated (GWh) | Capacity factor | Method |
|---|---|---|---|---|
| 2013 | — | 8,343.83 | 47% | HYDRO-V1 |
| 2014 | — | 5,995.75 | 34% | HYDRO-V1 |
| 2015 | — | 7,413.80 | 42% | HYDRO-V1 |
| 2016 | — | 7,567.55 | 43% | HYDRO-V1 |
| 2017 | — | 4,755.67 | 27% | HYDRO-V1 |
| 2018 | — | — | — | — |
| 2019 | — | — | — | — |
How it compares
Size among operating hydropower plants.
- In Europe
- 10th
- Age
- 23 yrs
of 1,398
Country average for hydropower: 57 yrs
4.3× the average hydropower plant in Russia. About 31% of the size of the largest.
FAQ
About Bureyskaya hydroelectric plant.
Who owns Bureyskaya hydroelectric plant?
Its main owner is PJSC RusHydro. It is operated by Bureyskaya HPP.
How big is Bureyskaya hydroelectric plant?
It has 2.0 GW of operating capacity. That makes it the 8th largest hydropower plant in Russia and the 82nd largest in the world.
Where is Bureyskaya hydroelectric plant?
In Bureysky District, Amur Oblast, Russia, at 50.2701, 130.3136.
When was Bureyskaya hydroelectric plant built?
It started operating in 2003.
Which river is Bureyskaya hydroelectric plant on?
The Bureya River.
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Hydropower Tracker (2026-03) · GEM Wiki page
- Output 2013–2019WRI Global Power Plant Database v1.3.0 · WRI1003675
- GEM plant IDL100000603232
- WEPP ID1033821
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.