- Operating capacity
- 73 MW
- Units
- 1
- Online since
- 2014
- Age
- 12 yrs
Bornish Wind Energy Centre is a 73 MW wind power plant in North Middlesex, Ontario, Canada.
It has been operating since 2014. It is owned mainly by NextEra Energy Inc and operated by NextEra Energy. By capacity it is the 134th largest of 320 operating wind plants in Canada.
- Owner
- NextEra Energy Inc
NextEra Energy Inc [100%]
- Operator
- NextEra Energy
- Coordinates
- 43.1380, -81.7381 (exact)
- GEM plant ID
- L100000906813
Plant details
How this wind plant is built and run.
- Installation
- Onshore
Electricity output
How much power this plant produces.
WRI Global Power Plant Database, 2013–2019.
- Latest annual output
- 169 GWh
- Capacity factor
- 26%
- Estimation method
- CAPACITY-FACTOR-V1
Estimated · 2017
Output as a share of running at full power all year
Show data table
| Year | Reported (GWh) | Estimated (GWh) | Capacity factor | Method |
|---|---|---|---|---|
| 2013 | — | — | — | NO-ESTIMATION |
| 2014 | — | — | — | NO-ESTIMATION |
| 2015 | — | — | — | NO-ESTIMATION |
| 2016 | — | — | — | NO-ESTIMATION |
| 2017 | — | 169.12 | 26% | CAPACITY-FACTOR-V1 |
| 2018 | — | — | — | — |
| 2019 | — | — | — | — |
How it compares
Size among operating wind plants.
- In Americas
- 1,046th
- Age
- 12 yrs
of 1,910
Country average for wind: 13 yrs
About average for Canada. About 15% of the size of the largest.
FAQ
About Bornish Wind Energy Centre.
Who owns Bornish Wind Energy Centre?
Its main owner is NextEra Energy Inc. It is operated by NextEra Energy.
How big is Bornish Wind Energy Centre?
It has 73 MW of operating capacity. That makes it the 134th largest wind plant in Canada and the 4,340th largest in the world.
Where is Bornish Wind Energy Centre?
In North Middlesex, Middlesex County, Southwestern Ontario, Ontario, Canada, at 43.1380, -81.7381.
When was Bornish Wind Energy Centre built?
It started operating in 2014.
How much electricity does Bornish Wind Energy Centre generate?
An estimated 169 GWh was generated in 2017, a capacity factor of 26%, according to the WRI Global Power Plant Database.
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Wind Power Tracker (2026-02) · GEM Wiki page
- Output 2013–2019WRI Global Power Plant Database v1.3.0 · CAN0007689
- GEM plant IDL100000906813
- WEPP ID65420
- World Resources Institute plant IDCAN0007689
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.